Similar Projects
Entrance and Security Upgrades
Results
Less than $940,000 est. value
Watertown, NY 13601

Entrance and Security Upgrades
Results
Less than $940,000 est. value
Watertown, NY 13601

Alexandria CSD 2019-2020 Capital Outlay Project
Results
Less than $75,000 est. value
Alexandria Bay, NY 13607

Carthage CSD Capital Project Additional Services at West Carthage Elementary
Results
Less than $550,000 est. value
Carthage, NY 13619

LaFargeville CSD District Wide Smart Schools Bond Act Project
Results
La Fargeville, NY 13656

LaFargeville CSD District Wide Smart Schools Bond Act Project
Results
La Fargeville, NY 13656

General Brown CSD Capital Improvements - Phase 2
Results
Less than $3,129,541 est. value
Dexter, NY 13634

General Brown CSD Capital Improvements - Phase 2
Results
Less than $3,129,541 est. value
Dexter, NY 13634

Watertown City School District Smart Schools Project
Bidding
Less than $1,917,000 est. value
Watertown, NY 13601

Watertown City School District Smart Schools Project
Bidding
Less than $1,917,000 est. value
Watertown, NY 13601

2019/2020 Capital Outlay Project
Results
Less than $100,000 est. value
Adams, NY 13605

2019/2020 Capital Outlay Project
Results
Less than $100,000 est. value
Adams, NY 13605

Sackets Harbor CSD - Capital Improvements - Phase 2
Results
Less than $3,950,000 est. value
Sackets Harbor, NY

Sackets Harbor CSD Capital Improvement Project - Phase 3
Results
Less than $920,000 est. value
Sackets Harbor, NY 13685

Sackets Harbor CSD Capital Improvement Project - Phase 3
Results
Less than $920,000 est. value
Sackets Harbor, NY 13685

Last Updated 03/22/2019 10:50 AM
Project Title

2018 Capital Improvement Project

Physical Address View project details and contacts
City, State (County) Adams, NY   (Jefferson County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Site Construction General Construction Mechanical Plumbing Electrical SED No. 22-09-09-04-0-010-009 K-12 SCHOOL SED No. 22-09-09-04-0-010-012 K-12 SCHOOL SED No. 22-09-09-04-5-004-004 BUS GARAGE SED No. 22-09-09-04-5-004-005 BUS GARAGE The contract scopes of work include but are not limited to: Site includes renovation of the existing soccer field, softball field and baseball field. General Construction includes roofing, concrete flooring, entry door work, auditorium and gymnasium work. Mechanical includes unit-vent replacement, air conditioning and bus garage heating replacement. Plumbing includes Bus Garage oil water separator upgrade, sump pumps, and misc. plumbing. Electrical includes all electrical connections for the Mechanical and Plumbing equipment, connections of the auditorium aisle lights, and connections in gymnasium.
Details
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents