Similar Projects
40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Cold Plane Pavement and Overlay With RHMA-G/RHMA-O
Infrastructure
Bidding
$67,000,000 CJ est. value
Fremont, CA 94538

Cold Plane Pavement and Overlay With RHMA-G/RHMA-O
Infrastructure
Bidding
$67,000,000 CJ est. value
Fremont, CA 94538

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Post-Bid
$75,000,000 CJ est. value
Hayward, CA 94544

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Post-Bid
$75,000,000 CJ est. value
Hayward, CA 94544

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Precast Concrete Pavement and HMA
Infrastructure
Results
$57,000,000 est. value
CA

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

Precast Conc Pvmt, Electronic Toll System, JPCP, CB & Structural Conc
Infrastructure
Construction
$175,969,550 CJ est. value
Sunol, CA 94586

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Sunol Ridge Roadway Reinforcement - Alameda County
Alteration
Conception
$1,000,000 est. value
Castro Valley, CA 94552

Last Updated 04/26/2023 03:02 PM
Project Title

Carl Munck ES - Asphalt Removal and Replacement

Physical Address View project details and contacts
City, State (County) Oakland, CA 94619   (Alameda County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes but not limited to: Cut, demolish, and excavate approximately 91,340 SF of failed pavement to depth of 3" and transport spoils to recycling center. Compact existing base rock, then sweeting it up with one inch of class II base rock, apply tack oil along perimeter edges, then provide, place and compact 2.5" of 0.5" medium hot-mix asphalt. AC Overlay with Fabric: Alternate in Lieu of R/R Grind/chip perimeter edges of overlay as required for flush transitions, clean pavement surface, fill crack with hot crack filler then apply tack oil, install pavement reinforcement fabric and place and compact 1.5 of" medium hot-mix asphalt on approximately 91,340 SF. After punch list is complete all warranties must be submitted. Valuation: 250 - 500 Thousand Project Type: Education Payment Type: Person Ordering Pays *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For questions or assistance concerning the Project Labor Agreement, contact Maribel Alejandre, (510) 835-7603 X 21, Davillier-Sloan, Inc. 1630 12 th Street, Oakland, California, 94607. On January 29, 2014, OUSD adopted a resolution amending the 2008 Local, Small Local, and Small Local Resident Business Enterprise Program (L/SL/SLRBE) and increasing the mandatory local participation requirement from twenty (20%) to fifty (50%) percent for all capital program/construction related contracts and professional services agreements. As with all OUSD projects, companies must be certified by the City of Oakland in order to earn credit toward meeting the participation requirement.

Details

91,340 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents