Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

Site Prep SPS Sterilizers and Equipment - Building 126 - 7th Floor
Renovation, Alteration
Design
Long Beach, CA 90822

Elihu M Harris Water Conservation
Infrastructure
Bidding
$403,000 est. value
Oakland, CA 94612

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Campus Accessibility and Site Improvements Project
Infrastructure
Bidding
$2,000,000 est. value
San Bernardino, CA

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Roadway Excavation, HMA (Type A), Culvert Work and RSP
Infrastructure
Results
$4,860,000 est. value
CA

New Park Site at the Southeast Corner
Infrastructure
Bidding
$300,000 est. value
Morgan Hill, CA 95037

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

Last Updated 05/30/2022 01:19 AM
Project Title

Stanfield Cutoff Restroom Site Preparations Project

Physical Address View project details and contacts
City, State (County) Big Bear Lake, CA   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves site improvements and preparations for the eventual installation of a pre-fabricated restroom building. Work includes site preparation, construction of the building foundation to manufacture specifications, construction of utility connections, and construction of ADA walkways. Building to be placed and installed by others.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents