Similar Projects
Staybridge Suites / Sevierville
New Construction, Infrastructure
Conception
$24,200,000 CJ est. value
Sevierville, TN 37862

Wilderness Resort Indoor Waterpark Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sevierville, TN 37876

Glennhill Warehouse Complex
New Construction - 31,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Sevierville, TN 37862

RFQ D/B - Great Smoky Mountains National Park Project TN NP GRSM 11(5)
Demolition, New Construction, Infrastructure
Bidding
$35,000,000 CJ est. value
Gatlinburg, TN 37738

36-Inch Sanitary Sewer Interceptor Rehab
Infrastructure
Bidding
$70,000 CJ est. value
Sevierville, TN 37862

Northview Baseball and Softball Fields
New Construction
Post-Bid
TN

Northview Junior Academy - Early Site Package
New Construction
Post-Bid
Sevierville, TN 37862

Pre-Engineered Building for the Public Works Street Department
New Construction - 5,400 SF
Results
Pigeon Forge, TN 37863

Park Maintenance Storage Building
New Construction - 1,200 SF
Results
Pigeon Forge, TN

Sugarlands Distilling
New Construction
Pending Verification
$20,000,000 est. value
Kodak, TN 37764

Cambria Hotel / Pigeon Forge
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Pigeon Forge, TN 37863

River Place Treehouses
New Construction, Infrastructure
Conception
$1,200,000 CJ est. value
Sevierville, TN 37862

Dutch Bros / Sevierville
New Construction, Infrastructure - 950 SF
Post-Bid
$500,000 CJ est. value
Sevierville, TN 37862

Construction of the Allensville Sewer Improvements
New Construction, Renovation, Infrastructure
Results
$2,722,513 CJ est. value
Sevierville, TN 37862

Mills Park Village
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Gatlinburg, TN 37738

Last Updated 10/20/2022 12:36 PM
Project Title

Robert Henderson Road Self Storage

Physical Address View project details and contacts
City, State (County) Sevierville, TN 37862   (Sevier County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a 625-square foot security and maintenance building and six, 3,000-square-foot self storage buildings. As of October 20, 2022 the project is in planning stage and seeking site plan approval from the City of Sevierville Planning Commission. A meeting was held October 6, 2022, but the results are not yet available. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but may is not expected to begin before the first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 18,625 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents