Similar Projects
College Acres Drive and Clear Run Branch Drainage Improvements and Stream Restoration Phase I
Infrastructure, Alteration
Post-Bid
Wilmington, NC 28403

Smith Creek Streambank Stabilization and Sanitary Sewer Reinforcement
Infrastructure
Post-Bid
Wilmington, NC 28411

Drysdale Drive Extension
Results
NC

Coastal Storm Risk Management Ocean Isle Beach, NC
Results
$5,000,000 to $10,000,000 est. value
Kure Beach, Ocean Isle Beach, Wrightsville Beach, NC

Polypropylene Pipe
Results

Sneeden Drive Culvert Replacement
Infrastructure
Results
Ogden, NC 28411

Ditch/Drainage Runoff - Mitigation
Infrastructure
Results
Wilmington, NC 28405

Flood Mitigation Project
Infrastructure
Results
Less than $300,000 est. value
Wilmington, NC 28401

Sanders Rd Sinkhole
Infrastructure
Results
NC

W-5601DH 3rd and Dock Street
Infrastructure
Results
Wilmington, NC 28401

Corrugated Aluminum Pipe
Infrastructure
Results
Castle Hayne, NC 28429

Mott Creek Stabilization/Restoration
Infrastructure
Results
Wilmington, NC

On-Call Foam Stabilization
Infrastructure
Results

Eden Village Infrastructure
Infrastructure
Results
Wilmington, NC

Coastal Storm Risk Management (CSRM)
Term Contract
Results
$10,000,000 to $25,000,000 est. value
Carolina Beach, NC

Reported 05/07/2022 12:00 AM
Project Title

Purchase of Pre-cast Concrete Structures

Physical Address View project details and contacts
City, State (County) NC   (New Hanover County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the 11'x4' box culvert shown in the attached plans. It is a double-barrel box culvert with an 18-inch sill in the high flow barrel. The box will need to meet NCDOT standards. Bearing capacity of the soil is expected to be very poor. In addition to the box culvert, there are 4 wingwalls indicated on the plan (2 on each end of the structure), some class III RCP, and a junction box structure. Rim elevation of the junction box structure will be 11.98'. The manhole ring and cover will be a solid lid marked "Storm" and must be NCDOT stamped and domestic to meet NCDOT standards and specifications. To accommodate the United States Army Corps of Engineers (USACE) requirements for embedment in the stream channel, each section of the box will need to be constructed in two pieces to facilitate placing 1-foot of material inside the box culvert prior to installing the top slab. The box culvert needs to be a solid double barrel culvert with a wall in the center. Each section of the box will need to be set as two separate pieces. The first piece consisting of the bottom, sides, and center wall of the box culvert. The second piece consisting of the top slab of the box culvert. This will allow for placement of material inside of the box culvert during construction to meet the 1' embedment requirement.

Details

Division 33 - Utilities, Culverts, Concrete Culverts, Precast Concrete Culverts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents