Similar Projects
Design Build Services for Orlando Tennis Center
Design
Less than $5,500,000 est. value
Orlando, FL

Construction of Eco Tourism Center at Magnolia Park
New Construction - 3,272 SF
Bidding
$3,600,000 est. value
Apopka, FL 32703

Playground Enhancement
Renovation
Bidding
Orlando, FL 32808

Contracting Services For Packing District Park Improvements
Post-Bid
Orlando, FL 32800

Rubberized Track Surfacing and Field Event Renovations
Post-Bid
Orlando, FL 32800

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Ocoee Lakefront Park Phase 1A
Results
$1,750,000 est. value
Ocoee, FL

Lake Lorna Doone Park Improvements - Phase II
New Construction, Renovation, Demolition
Construction
$8,000,000 est. value
Orlando, FL 32805

New Playground Equipment Installation
Renovation
Construction
Orlando, FL 32808

Operation of Mccoy Park Ballfields
Post-Bid
Orlando, FL 32802

Construction Manager at Risk Park, Utility, Trails and Other Public Projects
Results
FL

OCPS Rubberized Track Surfacing and Field Event Renovations
Term Contract
Post-Bid
Orlando, FL 32833

Tennis and Basketball Court Replacements
Results
Apopka, FL 32703

IDIQ Multiple Award Task Order Contracts for Vertical Construction, Renovation, Repair, and Incidental Design in Alabama, Florida, Mississippi, and Georgia. Seed Project: Lake Seminole - Purchase/Install Picnic Shelters in Multiple Parks
Renovation
Results
$1,000 to $1,900,000 est. value

Orange County Construction of Community Park on Parcel J
Results
$4,060,000 est. value
Orlando, FL

Reported 09/05/2019 06:52 AM
Project Title

Boone High School Softball Field

Physical Address View project details and contacts
City, State (County) Orlando, FL 32806   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description Scope of work includes the as-built surveys, earthwork required to provide the grading as per plan to prevent the future flooding, providing a construction entrance, preparing a temporary staging area, installing the silt fence and other necessary erosion control measures, installing the required utilities, finish the grading, replace the conflicting fence to match the existing, stabilize the disturbed area and sod the affected area.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents