Similar Projects
Plumbing Services
Term Contract
Bidding

Plumbing Services
Term Contract
Bidding

Curbio 5518
Sub-Bidding
Alexandria, VA 22312

Brock Plumbing Maintenance And Repair
Post-Bid
Virginia Beach, VA 23455

De-Grease Sewer Pipes
Post-Bid
Roanoke, VA

MARMC Chilled Water Piping Insulation
Results
Norfolk, VA 23511

Plumbing Piping and Accessories - 9873 - Sussex I DCE PAC
Results
State Farm, VA 23160

Citywide Plumbing Services
Bidding
Less than $50,000 est. value
Norfolk, VA

Plumbing On-Call Services, Repairs and Maintenance - Thomas Nelson Community College
Term Contract
Post-Bid
Less than $10,000 est. value
Hampton, VA 23666

Furnish and Deliver Copper Tubing
Term Contract
Results
$71,115 est. value
Fairfax, VA

21-Des-Itb-594 Plumbing Repair Services
Bidding
VA

Purchase, Deliver and Install Touchless Plumbing Fixtures
Post-Bid
Christiansburg, VA

Commercial Plumbing Services
Term Contract
Results
VA

Plumbing Equipment Grab Bars - Furnish and Deliver Only
Bidding
State Farm, VA

Plumbing Equipment - Rinnai Tankless Water Heater
Post-Bid
Capron, VA 23829

Reported 01/02/2020 08:26 AM
Project Title

Pond Fountain Replacement - Northern Virginia Community College

Physical Address View project details and contacts
City, State (County) Woodbridge, VA 22191   (Prince William County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Work to include clearing and grubbing to access control panels and fountains, trash and debris removal in the pond, removal of aquatic vegetation without harming the fish population and the rapid return of the treated vegetation. 2. Contractor shall install fountain system per the manufacturer’s recommendations 3. Contractor shall pass 5 year manufacturer warranty to the NVCC upon completion of the project. 4. Contractor shall provide NVCC with Operations and User Manuals and provide personnel with (1) hour training on how to operate the system Any damage caused by the contractor will be the sole responsibility of the contractor to repair at their cost

Details

Division 11 - Equipment, Operation and Maintenance of Equipment.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents