Similar Projects
Summit Softball Complex Improvements Roofing Replacements
Post-Bid
Ooltewah, TN 37363

Roof Replacement Program
Post-Bid
Chattanooga, TN 37402

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Replacement Roofing System For Fire Station #1
Results
Chattanooga, TN 37400

Roofing Repair and Maintenance
Post-Bid

Remove and Replace Walkway Roof Pans
Results
Less than $25,000 est. value
Chattanooga, TN 37407

Roof Inspections, Maintenance and Repairs
Term Contract
Post-Bid
Chattanooga, TN

CHA Central Office Re-Roofing Project
Results
Chattanooga, TN 37404

Roofing Repairs for Summit Ballfields
Post-Bid
Ooltewah, TN 37363

Roof and HVAC Replacement
Alteration
Results
Chattanooga, TN

Roof Repairs Summit Softball Complex
Post-Bid
Collegedale, TN 37363

Gym Roof System Replacement
Alteration
Results
Chattanooga, TN

Roofing Replacement, Maintenance and Repair
Post-Bid
$6,000,000 est. value

Remove Existing Roof at EPB's Hixson Branch Office
Alteration
Results
Chattanooga, Hixson, TN 37343

Unit Price Contract on Roofing
Term Contract
Post-Bid
Chattanooga, TN

Last Updated 03/09/2022 05:40 AM
Project Title

Boyton Terrace Reroofing

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37402   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bldg. 951,953.955,957,959 Complete tear off of existing roof and areas of wet or damaged light weight concrete decking. The damaged light weight concrete will be replaced by unit cost. add tampered insulation to remove low spots and aid in sloping to the existing drains. re-roof using a .80 mil to membrane. refer to project manual for additional scope of work. 1. Provide demolition to remove existing roofing and insulation to deck. 2. Roofing demolition and re roofing shall be coordinated with the hvac equipment and curbs, condensate drains lines, gas pipe and exhaust fans 3. The building will remain in operation during the re-roofing. 4. Provide tapered insulation to slope the roof to the existing drains. 5. Phase i roof replacement will start with the community building, 957 & 955.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents