Similar Projects
McDougal Retort Building
New Construction - 6,080 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Jordan, UT 84088

Cottonwood Improvement District - Rehab 2021 Sewer Pipeline
Bidding
$1,000,000 to $2,999,999 est. value
Sandy, UT

Saratoga Springs Redwood Road Stormwater Treatment
Bidding
Saratoga Springs, UT 84045

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Storm Drain Improvements in Canyon Near Lacey Way
Results
$500,000 to $600,000 est. value
North Salt Lake, UT

2019 Public Works Project
Results
Hyrum, UT 84319

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

Metcalf Mortuary
Addition - 917 SF
Construction
Saint George, UT 84770

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Utah Caldwell Wash Storm Drain Improvements
Results
Washington, UT 84780

Construction of the Cedar Heights Stormwater Improvements
Post-Bid
Kanab, UT 84741

Hillside Lane Storm Drain
Results
$150,000 to $200,000 est. value
Salt Lake City, UT 84106

2020 Cemetery Improvements
Post-Bid
Hooper, UT 84315

1700 East Storm Drain
Results
Springville, UT 84663

Last Updated 04/22/2021 11:23 AM
Project Title

Construction of the Pleasant Grove City - Cemetery Expansion Project

Physical Address View project details and contacts
City, State (County) Pleasant Grove, UT   (Utah County)
Category(s) Religious/Funeral, Sewer and Water
Sub-Category(s) Funeral Facility, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $234,212
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Are Approximately as Follows: Installation of Storm Drain, Curb and Gutter, Asphalt Paving, Irrigation and Landscaping Associated With the Construction of Phase 1 of the Cemetery Expansion. 2021 The installation of storm drain, curb and gutter, asphalt paving, irrigation and landscaping associated with the construction of the cemetery expansion in Pleasant Grove is to be completed by July15, 2021.

Details

Funeral Facility, Addition.
Division 11 - Equipment, Mortuary Equipment.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Sidewalks, Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures, Electrical Utilities, Electrical Utility Transmission and Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents