Similar Projects
Shyft Group Manufacturing Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$16,000,000 CJ est. value
Charlotte, MI 48813

Ultium 3 Battery Plant Bid Package 4 - Equalization Basin and Water Booster Station Improvements
Renovation, Infrastructure
Bidding
$761,000 CJ est. value
Delta Charter Township, MI 48917

Village of Vermontville - Main Street Resurfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Vermontville, MI 49096

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Crack Sealing, Sealcoating and Striping Parking Lots
Infrastructure
Results
Olivet, MI 49076

E Jefferson And Madison Street Improvements Project
Alteration
Results
$600,000 est. value
Bellevue, MI

I-96 EB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$21,331,000 CJ est. value
Dimondale, MI 48821

I-96 EB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$21,331,000 CJ est. value
Dimondale, MI 48821

2022 Crush, Shape and HMA Overlay Project
Infrastructure
Post-Bid
$200,000 est. value
Potterville, MI 48876

Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on M-43
Infrastructure
Results
$536,000 est. value
Grand Ledge, MI 48837

I-96 WB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Dimondale, MI 48821

HMA Resurfacing - Contract D
Infrastructure
Post-Bid
$2,000,000 est. value
Charlotte, MI

Overband Crack Fill
Infrastructure
Results
$923,290 CJ est. value
Charlotte, MI 48813

Village Park Revitalization - Village of Vermontville
Infrastructure
Pending Verification
$362,300 CJ est. value
Vermontville, MI 49096

Last Updated 07/10/2023 12:04 AM
Project Title

Full Depth Concrete Pavement Repairs on SB I-69

Physical Address View project details and contacts
City, State (County) Charlotte, MI 48813   (Eaton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $814,417 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Full depth concrete pavement repairs on SB I-69 from Vermontville Hwy to I-96 in the city of Potterville, Eaton County Net classification required for this project is 957 B or 957 Ba In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of B and Ba. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No 23063 218978A N/A MI DOT - 2307 033 - Full Depth Concrete Pavement Repairs on SB I-69

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents