Similar Projects
Last Updated | 07/10/2023 12:04 AM |
Project Title | Full Depth Concrete Pavement Repairs on SB I-69 |
Physical Address | View project details and contacts |
City, State (County) | Charlotte, MI 48813 (Eaton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $814,417 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Full depth concrete pavement repairs on SB I-69 from Vermontville Hwy to I-96 in the city of Potterville, Eaton County Net classification required for this project is 957 B or 957 Ba In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of B and Ba. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No 23063 218978A N/A MI DOT - 2307 033 - Full Depth Concrete Pavement Repairs on SB I-69 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |