Similar Projects
Fern Dell Road Local Improvement Program Project
Infrastructure
Bidding
Lake Delton, WI 53940

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Sauk City - IH 39, Eagle View Court to Weynand Road
Results
Sauk City, WI 53583

2021 Sycamore Street Reconstruction
Post-Bid
Sauk City, WI 53583

Asphaltic Paving
Results
Baraboo, WI

2021 Asphaltic Concrete Pavement
Post-Bid
Reedsburg, WI 53959

Reedsburg - Wisconsin Dells, N. Jct. STH 33 Intersection, Reedsburg -Wisconsin Dells, Copper Springs Road to N. Jct. STH 33, Reedsburg - Baraboo,N. Jct. STH 23 to USH 12
Results
Baraboo, Reedsburg, Wisconsin Dells, WI

Local Road Maintenance
Post-Bid
La Valle, WI

2021 8th Street and North Dewey Reconstruction
Results
Less than $410,000 est. value
Reedsburg, WI 53959

2021 Seal Coating
Post-Bid
WI

21st Street Extension
Results
Prairie du Sac, WI

CTHW - Local Road Improvement
Post-Bid
Baraboo, WI

2021 Street Improvements
Results
Baraboo, WI

Reported 06/15/2021 12:00 AM
Project Title

2021 Chip Seal

Physical Address View project details and contacts
City, State (County) WI   (Sauk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing of all labor and material for single seal chip sealing of the following roads: • Ski-Hi Road: US Hwy 12 termini, east to town line termini; approximately .75 miles • Kings Corner Road: Stones Pocket Road termini, west to Huber Road termini; approximately 1.95 miles • Stones Pocket Road: Kings Corner Road termini, north to termini; approximately .75 miles Approximately 3.45 total miles of road will be considered and bids should be based on a per mile basis

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents