Similar Projects
Betasso Water Treatment Facility Disinfection Capacity and Corrosion Control Project
Renovation
Bidding
$25,000,000 CJ est. value
Boulder, CO 80302

2023 Sewer Replacement - 27 Road - Unaweep Avenue to B 3/4 Road
Infrastructure
Bidding
$500,000 CJ est. value
Grand Junction, CO 81506

Colorado Springs Plumbing
Term Contract
Sub-Bidding
Colorado Springs, CO 80903

Plumbing Subcontractor Alamosa
Term Contract
Sub-Bidding
Alamosa, CO 81101

As-Needed Water Coolers Services
Term Contract
Post-Bid
Aspen, CO

Plumbing- Version 2
Term Contract
Post-Bid
Denver, CO

Bldg 1 Drinking Fountain Replacements
Term Contract
Results
Colorado Springs, CO 80915

Heating and Plumbing Services
Term Contract, Alteration
Results
Littleton, CO

Rio Blanco Outlet Rehabilitation
Infrastructure
Construction
$265,888 CJ est. value
Meeker, CO 81641

Crawford SP - Peninsula Area Utility Replacement/Repair
Infrastructure
Bidding
$300,000 CJ est. value
Crawford, CO 81415

Plumbing subcontractor/ Loveland Co.
Term Contract
Sub-Bidding
Loveland, CO 80537

Plumbing Installation Camper Registration Building
Alteration
Post-Bid
Walden, CO 80480

2Da--575 - (Con) Install Secondary Domestic Water Service
Term Contract
Results
$25,000 to $100,000 est. value
Grand Junction, CO 81501

Plumbing Subcontractor - Sterling
Term Contract
Sub-Bidding
Sterling, CO 80751

Shower Panel Replacement
Alteration
Post-Bid
$200,000 est. value
Pueblo, CO 81003

Last Updated 05/08/2023 10:31 AM
Project Title

Parmelee Hall - Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80521   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide pressure differential systems and decontamination units, contain the Work Area, all labor, materials, equipment, insurance, bonds and permits to complete the Project as specified in the Contract Documents. Drawing Sheets supplied provide additional information about the limits of the Work Areas and required procedures. The Contractor shall be responsible to verify the accuracy of material quantities to be included in his bid. If Contractor elects to supply water from adjacent hydrants, Contractor shall be responsible to coordinate with CSU for use of a meter at the fire hydrant. Contractor shall be responsible for all equipment related to supplying the site with water. Facilities Management at Colorado State University invites firm, competitive responses to provide all labor, materials, equipment, and services to demo and abate 9 bathrooms as indicated on included plans at Parmelee Hall located in Fort Collins, CO. Question Acceptance Deadline 04/25/2023 01:00 PM EDT

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents