Similar Projects
San Diego State University IV Dorms
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Calexico, CA 92231

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Winterhaven Shade Structure
Infrastructure
Bidding
$200,000 CJ est. value
Winterhaven, CA 92283

Water Treatment Plant Chlorine Conversion Project
Renovation, Infrastructure
Bidding
$800,000 CJ est. value
El Centro, CA 92243

Drilling Services
Term Contract
Post-Bid
Calexico, CA

J09 Calexico Paystation Shade Structure
Infrastructure
Post-Bid
$300,000 CJ est. value
Calexico, CA 92231

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

New River Improvement Project - Calexico Reach
Infrastructure, Renovation
Results
$40,690,908 CJ est. value
Calexico, CA 92231

Rockwood Avenue Fourplex
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Calexico, CA 92231

Cole Boulevard Apartments
New Construction, Infrastructure - 52,124 SF
Pending Verification
$14,000,000 CJ est. value
Calexico, CA 92231

Install Rumble Strips, Upgrade Guardrail, and Upgrade Facilities to Americans With Disabilities Act (ADA) Standards
Infrastructure
Design
$10,456,000 CJ est. value
Rockwood, CA 92227

Parks Division Yard Improvements Project
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
El Centro, CA 92243

Calexico West Land Port Of Entry Phase 2B
New Construction, Infrastructure
Post-Bid
$93,000,000 CJ est. value
Calexico, CA 92231

Bombay Beach Townsite Roadway Improvement Project
Infrastructure
Results
$2,579,755 CJ est. value
Imperial, CA 92251

Legion Street Improvements Project From Highway 86 to Western Avenue
Infrastructure
Post-Bid
$999,558 CJ est. value
Brawley, CA 92227

Last Updated 03/08/2023 06:06 PM
Project Title

RFQ Construction Manager - Imperial Middle-Mile Broadband Network Construction

Physical Address View project details and contacts
City, State (County) El Centro, CA 92243   (Imperial County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $88,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 11/30/2022 at 3:00 PM PT Proposers may submit written clarification questions to the Department at any time before on the last day for clarification questions listed in Section 2. Written clarification questions from Proposers may be presented to the Department by submitting them to the Departments Designated Contact. Project ID: 1122000210, 1122000236, 1122000238, 1123000001 00000000001 The Project is located on Route I-8, and SR-78, 86, and 111, in the County of Imperial at various locations. The project aims to construct portions of the middle-mile broadband network within State Right of Way. A more detailed description of the Project is contained in Appendix A. The estimated cost of this CMGC Project (in 2022 US dollars) is $88.86 million for construction capital and $4.8 million for Right of Way capital (including utility relocation). One copy of each completed Disclosure of Potential Conflict of Interest Certification (Appendix D), one (1) copy of each completed Prequalification Questionnaire (Appendix E), and one (1) copy of Preconstruction Services Cost Proposal are to be provided in separate sealed packages and delivered with the original SOQ to the address above. One copy of each completed Disclosure of Potential Conflict of Interest Certification (Appendix D), one (1) copy of each completed Prequalification Questionnaire (Appendix E), and one (1) copy of Preconstruction Services Cost Proposal are to be provided in separate sealed packages and delivered with the original SOQ to the address above. If applicable, please refer to the RFQ for goal requirement and attachments for licensing requirements for this contract. The Department do not have a copy of the plan holders list of available contractors, nor does it have a way of identifying companies or entities that may have downloaded the project documents for teaming purposes. The Department will allow the use of text with font size smaller than 12-point for only charts, tables, exhibits, and other illustrative and graphical information. Anticipated Ranking Determination 1/13/2023 Anticipated Award of Preconstruction Services Contract 1/30/2023 Anticipated Notice to Proceed 2/21/2023 Request to Return Cost Proposal Deadline 3/14/2023 Request Debriefing Meeting Deadline 3/14/2023 Anticipated Award of Construction Contract April 2024 Construction Complete Dec 2025

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents