Similar Projects
Eagle Point Park Home and 5-Car Garage
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Clinton, IA 52732

Goose Lake Wildlife Management Area Boat Access and Water Control Structure
Infrastructure
Bidding
$105,000 CJ est. value
Goose Lake, IA 52750

Parking Lot Improvement Project at Clinton Community College (MAin Campus)
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

Construction of a Heated Equipment Storage Facility
New Construction, Infrastructure
Results
$350,000 CJ est. value
Elwood, IA 52254

Career Technical Education Building - Bid Package 6
Infrastructure, Alteration
Results
$200,000 est. value
Clinton, IA 52732

Atlas Roofing Corporation Manufacturing Plant
New Construction, Infrastructure - 440,000 SF
Pending Verification
$224,000,000 CJ est. value
Clinton, IA 52732

Clinton Readiness Center Paving Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Clinton, IA 52732

Riverview Skate Park Improvements Project: Specialty Work
Infrastructure
Post-Bid
$522,024 CJ est. value
Clinton, IA 52732

S. 54th Street from US Hwy 30 to 44th Avenue S. and 36th Avenue S. Improvements
Infrastructure
Results
$4,747,210 CJ est. value
Clinton, IA 52732

Phase 3 - Addition & Renovation Camanche High School
Addition, Build-out, Renovation, Infrastructure
Post-Bid
$11,753,037 CJ est. value
Camanche, IA 52730

Regional Water Reclamation Facility (RWRF) Improvements Contract 5 - Outfall Expansion
Addition, Demolition, Infrastructure
Results
$1,354,200 CJ est. value
Clinton, IA 52732

Riverview Skate Park Improvements Project: Non-Specialty Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Clinton, IA 52732

Regional Water Reclamation Facility Contract 4 ADM Pump Station
New Construction, Infrastructure
Results
$4,578,000 CJ est. value
Clinton, IA 52732

Public Works Office Building Addition
Addition, Demolition, Infrastructure - 1,600 SF
Post-Bid
$785,735 CJ est. value
Clinton, IA 52732

Last Updated 08/16/2023 01:35 AM
Project Title

Clinton Marina Improvements Project

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project shall consist of relocating the relocating the 65' x 35' "party dock" to the new location shown on plans. As part of this relocation the contractor shall remove dock railing panels and relocate them to accommodate the new openings. In the area where the floating dock was removed the contractor shall furnish and install railing to address gap created by the "party dock" removal. The concrete "party dock" decking shall be replaced with composite decking. Upon the relocated party dock the contractor shall construct a wood frame ship store to the size and at the location shown on plans. All finishes colors hardware etc., shall be coordinated with owner. See sheets 3 and 6 for further notes. Three 20' finger docks and approximately 52' of dock extension shall be installed as shown on plans. An approximately 50' connector dock shall attach the existing fueling dock to the docks to the north. All docks shall have appropriate railing installed. Bid security is set in the fixed amount of five percent (5%) of the total bid amount. Questions Deadline: 8/23/2023 08:00 AM (CT) The City Council will award the bid at their meeting on September 12, 2023. The low bidder must return the signed contract and performance bond by September 22, 2023. The above work shall be commenced as soon as possible after the contract and bond have been approved by the City Attorney and have been signed by the Mayor and City Clerk. The substantial completion date for this project shall be April 1, 2024. All punch list and final completion items shall be complete by May 3, 2024. Liquidated damages shall be $250.00 per day, as per the special conditions.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents