Similar Projects
Overhead Doors for Maintenance and Bus Storage Facilities
Renovation
Sub-Bidding
$60,000 CJ est. value
Jackson, MI 49203

City Hall Window Replacement
Renovation
Sub-Bidding
$440,000 CJ est. value
Norton Shores, MI 49441

Wood Window Replicas
Post-Bid
Detroit, MI

Historical Window Restoration
Term Contract
Post-Bid
Detroit, MI

Annual Overhead Doors Inspections And Repairs
Results
Detroit, MI

Records Building Window Replacement
Results
Lansing, MI 48906

Cheyboygan Lock - Facility Repairs
Renovation
Sub-Bidding
$200,000 CJ est. value
Birmingham, MI 48009

Harbor Springs High School First Floor Painting Project and Harbor Springs High School Locker Removal and Installation Project
Alteration
Post-Bid
Harbor Springs, MI

Gus Harrison Correctional Facility Security Gate and Controls Repair Replacement
Results
Adrian, MI 49221

Overhead Door Replacement at Central Fire Station
Renovation
Sub-Bidding
$60,000 CJ est. value
Jackson, MI 49201

HS Window Repair Project
Alteration
Post-Bid
Eastpointe, MI

Remove and Install Outer Doors and Frames for Beverly Hills and Waterford Office
Results
Beverly Hills, Waterford Township, MI 48328

Window Replacement at Central Fire Station
Renovation
Sub-Bidding
$400,000 CJ est. value
Jackson, MI 49201

Door Replacement Project
Alteration
Post-Bid
Clawson, MI

Shelby Door Removal/Replacement Project
Results
Shelby Township, MI 48315

Last Updated 12/07/2022 06:12 PM
Project Title

Secure Prison Doors

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a request for 10 secure prison doors for Lakeland Correctional Facilities Segregation Unit (LCF). Installation services are not required MDOC staff will be completing all installations. Questions regarding parts, repairs and maintenance agreements are also included. This bid is brand specific. Bidders must submit any proposed alternates as a question by the deadline for bidder questions. Specifications must be emailed with the question. The State may or may not approve a proposed alternate, at its sole discretion. Approval or disapproval of proposed alternates will be posted in the Q&A document online. The State reserves the right to add goods and services during the contract period. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder's company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State's publicly available website after bidders are notified of the award recommendation. This bid is brand specific. Bidders must submit any proposed alternates as a question by the deadline for bidder questions. Specifications must be emailed with the question. The State may or may not approve a proposed alternate, at its sole discretion. Approval or disapproval of proposed alternates will be posted in the Q&A document online. Deadline for bidders to submit questions about this RFP 3:00 p.m. Eastern Friday, November 18, 2022. Anticipated contract issue date Wednesday, January 4, 2023. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder's failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded. Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State's publicly available website after bidders are notified of the award recommendation. Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary. The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies the Proposal Page #, Section #, and Paragraph #, (2) identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), and (3) explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name. Bidders must also provide the contact information for the person at their organization authorized to respond to inquiries by the State concerning the material. This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term "Contractor" in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term "bidder" is used to identify where specific responses to the RFP are required. The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified. If any of the required policies provide claims-made coverage, the Contractor must: (a) provide coverage with a retroactive date before the Effective Date of the Contract or the beginning of Contract Activities; (b) maintain coverage and provide evidence of coverage for at least 3 years after completion of the Contract Activities; and (c) if coverage is cancelled or not renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Contract Effective Date, Contractor must purchase extended reporting coverage for a minimum of 3 years after completion of work. Contractor must: (a) provide insurance certificates to the Contract Administrator, containing the agreement or delivery order number, at Contract formation and within 20 calendar days of the expiration date of the applicable policies; (b) require that subcontractors maintain the required insurance contained in this Section; (c) notify the Contract Administrator within 5 business days if any insurance is cancelled; and (d) waive all rights against the State for damages covered by insurance. Failure to maintain the required insurance does not limit this waiver. This Section is not intended to and is not to be construed in any manner as waiving, restricting or limiting the liability of either party for any obligations under this Contract (including any provisions hereof requiring Contractor to indemnify, defend and hold harmless the State). Pursuant to Michigan law, all agencies subject to IRS Pub. 1075 are required to ask the Michigan State Police to perform fingerprint background checks on all employees, including Contractor and Subcontractor employees, who may have access to any database of information maintained by the federal government that contains confidential or personal information, including, but not limited to, federal tax information. Further, pursuant to Michigan law, any agency described above is prohibited from providing Contractors or Subcontractors with the result of such background check. For more information, please see Michigan Public Act 427 of 2018. Upon request, or as may be specified in Schedule A, Contractor must perform background checks on all employees and subcontractors and its employees prior to their assignment. The scope is at the discretion of the State and documentation must be provided as requested. Contractor is responsible for all costs associated with the requested background checks. The State, in its sole discretion, may also perform background checks.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents