Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Asphalt Resurfacing
Results
Hillsborough, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Widens I-95 to Eight Lanes and Reconstructs Interchanges from South of I-95 Business / US 301 (Exit 56) to North of SR 1002 (Long Branch Road - Exit 71) in Cumberland and Harnett Counties.
Results

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

Wrightsville Beach Paving Project
Results
Wrightsville Beach, NC

Last Updated 11/14/2019 05:05 AM
Project Title

On-Call Tiered Paving in Craven County

Physical Address View project details and contacts
City, State (County) NC   (Craven County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 Sp Mobilization 1 Ea 2 535 Conditioning Existing Base 15 Msy Begin Tier 1 Payment Schedule 3 Sp Milling Asphalt Pavement, 1” To 3” (Tier 1 – 0 To 500 Sy) 100 Sy 4 Sp Asphalt Conc Base Course, Type b25.0c (Tier 1 – 0 To 50 Ton) 50 Ton 5 Sp Asphalt Conc Intermediate Course, Type i19.0c (Tier 1 – 0 To 50 Ton) 50 Ton 6 Sp Asphalt Conc Surface Course, Type s4.75a (Tier 1 – 0 To 50 Ton) 50 Ton 7 Sp Asphalt Conc Surface Course, Type s9.5c (Tier 1 – 0 To 50 Ton) 50 Ton 8 Sp Asphalt Conc Surface Course, Type s9.5b (Tier 1 – 0 To 50 Ton) 50 Ton Begin Tier 2 Payment Schedule 9 Sp Milling Asphalt Pavement, 1” To 3” (Tier 2 – 501 To 1,000 Sy) 750 Sy 10 Sp Asphalt Conc Base Course, Type b25.0c (Tier 2 – 51 To 500 Ton) 100 Ton 11 Sp Asphalt Conc Intermediate Course, Type i19.0c (Tier 2 – 51 To 500 Ton) 100 Ton 12 Sp Asphalt Conc Surface Course, Type s4.75a (Tier 2 – 51 To 500 Ton) 100 Ton 13 Sp Asphalt Conc Surface Course, Type s9.5c (Tier 2 – 51 To 500 Ton) 100 Ton 14 Sp Asphalt Conc Surface Course, Type s9.5b (Tier 2 – 51 To 500 Ton) 100 Ton Begin Tier 3 Payment Schedule 15 Sp Milling Asphalt Pavement, 1” To 3” Depth (Tier 3 – 1,001 To 2,000 Sy) 1,500 Sy 16 Sp Asphalt Conc Base Course, Type b25.0c (Tier 3 – 501 To 1,000 Ton) 750 Ton 17 Sp Asphalt Conc Intermediate Course, Type i19.0c (Tier 3 – 501 To 1,000 Ton) 750 Ton 18 Sp Asphalt Conc Surface Course, Type s4.75a (Tier 3 – 501 To 1,000 Ton) 750 Ton 19 Sp Asphalt Conc Surface Course, Type s9.5c (Tier 3 – 501 To 1,000 Ton) 750 Ton 20 Sp Asphalt Conc Surface Course, Type s 9.5b (Tier 3 – 501 To 1,000 Ton) 750 Ton Begin Tier 4 Payment Schedule 21 Sp Milling Asphalt Pavement, 1” To 3” Depth (Tier 4 – 2,000+ Sy) 2,000 Sy 22 Sp Asphalt Conc Base Course, Type b25.0c (Tier 4 – 1,000+ Ton) 1,000 Ton 23 Sp Asphalt Conc Intermediate Course, Type i19.0c (Tier 4 – 1,000+ Ton) 1,000 Ton 24 Sp Asphalt Conc Surface Course, Type s4.75a (Tier 4 – 1,000+ Ton) 1,000 Ton 25 Sp Asphalt Conc Surface Course, Type s9.5c (Tier 4 – 1,000+ Ton) 1,000 Ton 26 Sp Asphalt Conc Surface Course, Type s 9.5b (Tier 4 – 1,000+ Ton) 1,000 Ton End Tier Schedules 27 620 Asphalt Binder For Plant Mix 250 Ton 28 858 Adjustment Of Manholes 1 Ea 29 858 Adjustment Of Meter Boxes Or Valve Boxes 1 Ea 30 Sp Generic Grading – Hauling Ncdot Supplied Shoulder Material 100 Ea 31 Sp Shoulder Reconstruction 10 Smi 32 Sp Asphalt Patching – i 19.0c Crosslines & Non-Production Sites 10 Ton 33 Sp Asphalt Patching – s 9.5b Crosslines & Non-Production Sites 10 Ton 34 Sp Incidental Stone Base 50 Ton

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents