Similar Projects
Flat Roof Replacement Project at Ridge Apartments
Alteration
Bidding
Southwest Harbor, Southwest Harbor, ME 04679

MeANG Building B493 Re-Roof
Alteration
Bidding
$500,000 to $750,000 est. value
Bangor, ME

Installation of Metal Roofing
Post-Bid
Fort Fairfield, ME 04742

Roof Replacement - The Fort Kent Knights of Columbus
Post-Bid
Fort Kent, ME

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Asphalt Roof
Alteration
Bidding
Saint Agatha, ME 04772

Flanagan Recreation Center Roof Replacement/Repairs
Post-Bid
Rockland, ME 04841

Design/Build of Sheds and Roofs at Public Works Facility
Results
New Gloucester, ME 04260

Roofing MACC
Post-Bid

Waterville Public Library Roof Repairs for 2020
Results
Waterville, ME 04901

Silo Observatory Roof/Wall Replacement
Post-Bid
Levant, ME 04419

Roof Replacement and Restoration
Results
Augusta, ME

Roofing Repair and Maintenance
Post-Bid

Roof Replacements at the Bolduc Correctional Facility
Results
$50,000 est. value
Warren, ME

Last Updated 08/19/2021 09:42 AM
Project Title

Carter Hall Roof Replacements Project

Physical Address View project details and contacts
City, State (County) Waterville, ME 04901   (Somerset County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work involves all safety measures, protection, removals, new construction and equipment installations located on a single roof area of Carter Hall. The majority of the work will take place on a second floor roof area, accessible from the 2nd Floor Mechanical Room via one fixed roof ladder w/ safety cage, and one regular ladder tied down (section of Third Floor roof in between. The project scope includes removal of select existing EDPM roofing assemblies and accessories located on a second story roof area, and replacement with new EDPM roof assemblies and accessories. Based on a professionally prepared structural analysis, some routine structural reinforcement is required as indicated in the contract documents to meet snow drift loading requirements that were missed in the original 1990’s structural design. The intent is to conduct as much of this reinforcement work from above as possible with minimal disturbance at the Second Floor ceiling level. There are areas where select removals and repairs are required to existing exterior insulation finish systems. Where ten (10) existing sky-lights are to be removed, metal roof deck and interior gypsum board assembly repairs are required. There are minor interior electrical lighting removals/modifications in the former skylight wells, however no rooftop mechanical equipment or roof penetrations (other than new roof drains connecting to existing piping) exist. Some alternate bid items are also included.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents