Similar Projects
Gunnison Crested Butte Regional Airport Renovation and Expansion
Addition - 47,741 SF
Construction
Gunnison, CO 81230

UAV Building Restroom Addition
New Construction
Post-Bid
$90,000 est. value
Rifle, CO 81650

Grand Junction Regional Airport Rental Car and TSA Checkpoint Renovation
Renovation
Construction
Grand Junction, CO 81506

Pueblo Memorial Airport Terminal Remodel
Renovation
Results
Pueblo, CO 81001

Colorado Springs Airport IT Server Room Remodel
Renovation
Results
Less than $340,000 est. value
Colorado Springs, CO 80903

Downtown Boulder Station Expansion
Addition
Conception
$982,000 est. value
Boulder, CO 80305

Airline Ticketing and Rental Car Counter Modernization
Results
Colorado Springs, CO

New Airport Terminal
New Construction
Design
$26,400,000 est. value
Loveland, CO 80538

Deice Pad and Apron Rehabilitation Yampa Valley Regional Airport
Renovation
Results
Less than $4,256,607 est. value
CO

Regional Airport New Passenger Terminal Building
New Construction - 26,000 SF
Results
$17,000,000 to $21,000,000 est. value
Loveland, CO 80538

New Loveland Transit Center
New Construction
Conception
Loveland, CO 80538

Improvements To The Eagle County Regional Airport
Results
Gypsum, CO

Bristles 2021 Yampa Valley Regional Airport
New Construction
Results
Hayden, CO 81639

Airport Terminal Partnership Development Opportunity
New Construction
Post-Bid
Loveland, CO 80537

Last Updated 02/07/2022 10:40 AM
Project Title

Room Remodels

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80916   (El Paso County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To install a new Lactation Room at the Gate Concourse and remodel an administration office Work will require access to the terminal secured areas at the Gate Concourse and third floor administration office and shall be subject to security access and badging requirements at the expense of the Proposer. This includes all equipment, tools, materials, etc. At no time will any contractor unload or store its equipment, tools, materials, etc. into any adjoining space. The Airport will provide an area for secure tool storage if deemed necessary for this project. No tools, equipment, fixtures, and materials shall be left unattended at any time in areas accessible to the public. Where access poses a security concern, the Proposer shall provide/install a door(s) with a closer and cipher lockset. The contractor is to secure the premises when not present and to assume responsibility for all tools, equipment, fixtures, and materials in the premises. Closed-off construction areas and limits to be approved by Airport before implemented. Access, security and constraints to the work area shall be made in strict compliance with the Airport Security Plan. All Proposer personnel, materials and equipment entering and/or are actively within secured areas are subject to safety and security inspection.

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents