CDBG - Public Work Drainage Improvements Project
Bidding
$165,041 est. value
Hallandale Beach, FL 33009

SNL Infrastructure Construction and Maintenance
Infrastructure
Bidding

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Drainage
Results
Less than $250,000 est. value
FL

Transportation and Surface Drainage and Ongoing Rehabilitation Program
Results
$861,319 to $1,019,136 est. value
Southwest Ranches, FL 33332

Drainage Outfall Rubble Rap
Infrastructure
Bidding
$500,000 est. value

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Bonaventure Boulevard and Fire Station 55 Drainage Improvement
Results
Weston, FL 33326

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Desilting
Results
Less than $350,000 est. value
FL

Oakhill Culvert Replacement
Results
Less than $200,000 est. value
Davie, FL 33314

Canal Bank Erosion Tubing
Term Contract
Results
Margate, FL 33063

Historic Miramar Drainage System Improvements Phase V
Results
$400,000 to $550,000 est. value
Miramar, FL 33025

Last Updated 05/14/2021 03:50 PM
Project Title

Bamford Sports Complex - Drainage Pipe Restoration

Physical Address View project details and contacts
City, State (County) Davie, FL 33328   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide material and labor to remove and reinstall a damaged section of a 12” drainpipe at the Bamford Sports Complex (3801 S Pine Island Road, Davie, FL 33328). To remove a section of an existing 6” thick concrete slab, excavate to expose the section of a damaged 12” HDPE pipe, remove and replace the damaged 12” HDPE pipe with new 12” HDPE pipe, backfill the excavation, and pour a new 6” thick concrete pad to cover.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents