Similar Projects
RFP Engineering - Cecilton Wastewater Plant ENR Refinement
Renovation
Conception
$250,000 CJ est. value
Elkton, MD 21921

Patapsco Centrate Treatment Facilities - 551-150
Renovation
Conception
$54,473,000 est. value
Baltimore, MD 21226

Princess Anne Wastewater Treatment Plant Enhanced Nutrient Removal Upgrade
Addition
Design
$6,000,000 est. value
Princess Anne, MD

RFQ D/B - Repair of Steam Sterilization Plant, Fort Detrick, Maryland
Renovation
Bidding
$100,000,000 CJ est. value
Frederick, MD 21702

Mattawoman Wastewater Treatment Plant Electrical and Automation Improvements
Renovation
Bidding
$20,000,000 CJ est. value
La Plata, MD 20646

Structural Concrete Services
Term Contract
Sub-Bidding
Laurel, MD 20707

Sodium Hypochlorite Solution 15% (Gallon Bulk) Cambridge Wastewater Treatment Plant - SBR Procurement
Term Contract
Sub-Bidding
Cambridge, MD 21613

ENR Upgrade to the Twin Cities Wastewater Treatment Plant
Post-Bid
Secretary, MD

Water Treatment Plant and Distribution System
New Construction
Post-Bid
Henderson, MD

Victor Cullen Center Wastewater Treatment Plant and Collection System Upgrades
Results
Sabillasville, MD 21780

Mattawoman Water Reclamation Facility Sludge Processing
Results
La Plata, MD 20646

Gas House Pike Wastewater Treatment Plant Equalization Basin Expansion And Rehabilitation - 370014 - City Of Frederick
Renovation
Conception
$1,250,000 est. value
Frederick, MD

Egg Shaped Digester Rehabilitation Improvements at the Back River Wastewater Treatment Plant
Renovation
Bidding
$70,000,000 to $80,000,000 est. value
Baltimore, MD 21224

Liquid Magnesium Hydroxide Suspension Gallons Dorsey Run Wastewater Treatment Plant
Term Contract
Sub-Bidding
Jessup, MD 20794

Sludge Holding Tank Aerator and Install
Renovation
Post-Bid
Beltsville, MD 20705

Last Updated 08/12/2022 11:33 AM
Project Title

Runnymede Wastewater Treatment Facility Rehabilitation - 6457 - Carroll County

Physical Address View project details and contacts
City, State (County) Westminster, MD 21157   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $760,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides planned funding for the rehabilitation of the Runnymede Sequential Batch Reactor (SBR) Wastewater Treatment Facility, which was put in service in 1994 and serves Runnymede Elementary School. The scope includes replacement pumps, UV blowers, a generator, and a transfer switch; as well as electrical/control upgrades, painting of the SBR tanks, and other site improvements. The project is included in the county's 2023-2028 Capital Improvement Program (CIP). As of August 12, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents