Similar Projects
2022 General Building Systems 2 (GBS2) PPI
Alteration
Results
Fort Wayne, IN

2022 General Building Systems 1
Alteration
Post-Bid
Fort Wayne, IN

Finish Update- Fisher Building Basement Selective Areas
Alteration
Post-Bid
$830,000 est. value
Muncie, IN 47305

Fisher Lower Level and Stairwells Refresh
Alteration
Results
$250,000 est. value
Indianapolis, Muncie, IN 47305

Update Utilities, Building 49
Alteration
Post-Bid
Marion, IN 46953

CCS Facilities and Transportation Westside Building Finishes
Alteration
Results
Carmel, IN 46032

Metal Wall Panel Replacement
Alteration
Post-Bid
Fortville, IN

Franklin City Hall Exterior Repairs
Alteration
Results
Franklin, IN

Lincolnshire Apartments - Phase 2 Interior
Renovation, Alteration - 23,500 SF
Post-Bid
$2,000,000 est. value
Anderson, IN 46016

Glendale Branch Ceiling Panel Replacement
Alteration
Results
Indianapolis, IN 46220

Fishback Creek Public Academy Metal Wall Panel Replacement
Alteration
Post-Bid
Indianapolis, IN 46278

Ben Davis High School Interiors (Bathrooms / Track)
Renovation, Infrastructure
Post-Bid
$800,000 est. value
Indianapolis, IN 46214

Fisher Lower Level and Stairwells Refresh
Alteration
Results
$250,000 est. value
Indianapolis, Muncie, IN 47305

Indiana Convention Center - Carpet Replacement
Renovation
Post-Bid
$8,000,000 CJ est. value
Indianapolis, IN 46225

Van Nuys Medical Sciences - West Side Curtain Wall Repairs
Renovation
Results
$145,000 CJ est. value
Indianapolis, IN 46202

Last Updated 06/27/2023 01:30 PM
Project Title

Decatur Central High School Broadcast Studio Upgrades

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46221   (Marion County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Broadcast Studio Upgrades. The project will include a full video/audio production setting based on an IP workflow with spoke and hub for remote venues to be incorporated to allow recording plus streaming of live events. School will be responsible for fiber pulls from the control room/rack to remote locations. The production referenced above will include the following: studio camera package, switcher, replay, graphics, audio, intercom and sports announcers, wireless camera equipment, EFP camera packages, engineering core, network switches, and shading positions. the right to waive any informality and to accept or reject any or all bids

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents