Similar Projects
NOI- Brand Name or Equal- Andover HVAC Controls
Renovation
Design
$100,000 CJ est. value
Loma Linda, CA 92354

RFP Design - High School Gymnasium HVAC Project
Renovation
Bidding
$2,000,000 CJ est. value
Redlands, CA 92374

Grace Yokley Middle School Locker Room HVAC Addition
Alteration
Post-Bid
$200,000 est. value
Ontario, CA 91761

Recreation Center HVAC
Alteration
Post-Bid
Needles, CA 92363

AVUSD: HVAC Replacement at Five Various Sites - Phase 2 Project
Alteration
Results
$500,000 est. value
Apple Valley, CA

California Institution for Men Air Cooling, Facility A
Renovation
Results
$11,108,918 CJ est. value
Chino, CA 91710

General Services Air Conditioning Installation
Term Contract
Post-Bid
$400,000 est. value
Highland, CA 92346

Alta Loma High School Central Plant Chiller Replacement
Renovation
Results
$936,237 CJ est. value
Rancho Cucamonga, CA 91701

HVAC Units
Term Contract
Post-Bid
Rialto, CA

Civic Center HVAC Plant Replacement Project
Renovation
Results
$1,926,000 CJ est. value
Rancho Cucamonga, CA 91730

HVAC Systems Maintenance, Monitoring and Repair
Term Contract
Post-Bid
$75,000 CJ est. value
Highland, CA 92346

BL 10 Cooling Tower Replacement
Renovation
Results
$1,088,248 CJ est. value
Yucaipa, CA 92399

HVAC Replacement at 3 Various Sites - Phase 3
Renovation
Post-Bid
$500,000 CJ est. value
Apple Valley, CA 92307

Greenhouse HVAC Equip And DDC Controls
Renovation
Results
$4,400 CJ est. value
San Bernardino, CA 92407

Building Maintenance Division HVAC Supplies
Term Contract
Post-Bid
Redlands, CA 92373

Last Updated 08/17/2023 11:23 AM
Project Title

Front Country Ranger District HVAC Replacements

Physical Address View project details and contacts
City, State (County) Lytle Creek, CA 92358   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The contractor shall provide all labor, materials, equipment, securing all permits, fees, and requirements from state and local county offices for the completion of the Front Country Ranger District HVAC replacements. The project consists of the replacement of three units at two sites. The first two units serve the Lytle Creek Fire Station Office building. The third unit is a roof mounted unit that serves the Mill Creek Hot Shots Office. magnitude : $25,000 - $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions must be submitted in writing, via email, to Christopher Jordan at. christopher.iordan2@usda.gov no later than Friday, August 18,2023, at 1200 PST. All Q&As will be posted on the SAM.gov site as soon as practical

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents