Similar Projects
Atlantic Coast of MD 2021 Berm Reconstruction
Design
$10,000,000 to $25,000,000 est. value
Ocean City, MD

Poplar Island Cell 1C Inlet Repairs, Poplar Island, MD
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
MD

Laramie Lane Drainage Improvements
Post-Bid
Lusby, MD 20657

Crazy Horse Trail Washout
Post-Bid
Lusby, MD 20657

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Turkey Point Shoreline Management
Pending Verification
Edgewater, MD 21037

Whispering Pine Circle Drainage Improvements
Post-Bid
Lusby, MD 20657

Providing Roadside and Drainage Maintenance for the Administration's Maintenance Shops Located in Anne Arundel County
Results
$1,000,000 to $2,500,000 est. value
MD

Stormwater Facilities Maintenance
Term Contract
Post-Bid
Salisbury, MD

Cox Creek DMCF +60 Dike Raising and Expansion
Results
MD 21226

North Alley Drainage Improvements - Phase 2
Post-Bid
New Market, MD 21774

Z--CHOH 151201 McMahons Mill to Lock 42
Results
$5,000,000 to $10,000,000 est. value
Williamsport, MD 21795

Longfield Drainage Improvements
Post-Bid
$2,500,001 to $5,000,000 est. value
Forestville, MD 20747

Stormwater and Roadway Drainage Maintenance Services
Results

Reported 02/18/2022 12:00 AM
Project Title

Restore Canal Prism

Physical Address View project details and contacts
City, State (County) Hagerstown, Williamsport, MD   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Restore canal prism; stabilize historic dry laid stone wall: Remediation will consist of restoring the canal prism through the removal of vegetation, silt, and debris; repairing voids behind the wall and underneath the canal prism; installing an underdrain system to intercept future groundwater; replacing the clay liner with a new fabric liner to prevent leakage from the canal; stabilizing adjacent tributaries to prevent additional sediment from accumulating within the canal; stabilizing the existing dry stone wall; and restoring the work area.

Details

Division 01 - General Requirements.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents