Similar Projects
Jabil Gateway - Master Plan
New Construction
Conception
Saint Petersburg, FL

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

The Moxy
New Construction, Renovation - 16,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Saint Petersburg, FL 33705

Walmart Neighborhood Market #5670-220 - SPRB-R
Renovation - 38,951 SF
Bidding
Clearwater, FL 33765

Conn's Home Plus
Renovation - 40,000 SF
Bidding
Pinellas Park, FL 33781

DG St Petersburg - Self Storage
New Construction, Demolition - 95,400 SF
Sub-Bidding
Saint Petersburg, FL 33711

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Rooms To Go
New Construction - 50,877 SF
Post-Bid
Clearwater, FL 33761

Development of Residential Property - Lealman Community Redevelopment Area
Results
Clearwater, FL 33756

Tropicana Field Redevelopment
Results
Saint Petersburg, FL

Evergreen Village AKA Lincoln Village Supportive Housing
New Construction
Construction
$5,118,668 est. value
Pinellas Park, FL 33781

Saltaire
New Construction, Build-Out
Construction
$250,000,000 est. value
Saint Petersburg, FL 33701

Highland Crossing
New Construction
Pending Verification
Dunedin, FL 34698

1101 Pinellas Street Duplex
New Construction
Pending Verification
Clearwater, FL 33756

Orange Station at the Edge
New Construction, Build-Out, Demolition - 122,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Saint Petersburg, FL 33701

Reported 01/13/2022 10:50 AM
Project Title

North Greenwood Community Redevelopment Plan

Physical Address View project details and contacts
City, State (County) Clearwater, FL   (Pinellas County)
Category(s) Commercial, Residential
Sub-Category(s) Multi-Family Homes, Retail
Contracting Method Competitive Bids.
Project Status Master Planning
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To facilitate and develop the Community Redevelopment Plan (Plan). The planning process for the Plan shall include public engagement, development of plans and policies, and an implementation strategy to improve the blighted conditions of the area, while limiting displacement of current residents and businesses

Details

Retail, New Construction, Multi-Family Homes, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents