Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Mission Ridge Resort Expansion
New Construction
Conception
Wenatchee, WA 98801

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

D/B - Laurier Land Port of Entry - Concrete, Paving, Painting
Infrastructure
Design
$1,000,000 est. value
Laurier, WA

2022 Pedestrian Improvements
Infrastructure
Bidding
$380,000 to $425,000 est. value
Tumwater, WA

West Cota Street Parking Lot Improvements
Infrastructure
Bidding
$410,000 to $500,000 est. value
Shelton, WA 98584

Rainier Beach High School - Bid Package 10 - Earthwork and Utilities
Infrastructure
Sub-Bidding
Seattle, WA 98118

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,849,000,000 est. value
Tacoma, WA 98405

14th Avenue Residential Development
New Construction, Demolition, Alteration
Pending Verification
$1,000,000 est. value
Seattle, WA 98117

RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

2021-23 ER Region Wide Basic Safety - Signing
Infrastructure
Design
$782,000 est. value
Spokane, WA 99201

Last Updated 07/03/2022 11:32 PM
Project Title

Burley Glenwood Elementary School - ADA Site Improvements

Physical Address View project details and contacts
City, State (County) Port Orchard, WA 98367   (Kitsap County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the ADA Facility and Site Improvements at Burley Glenwood Elementary School. Work includes tree removal, site grading, construction of a concrete stairway and ADA compliant ramp, site lighting and landscape restoration

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Structural Concrete, Precast Concrete Stairs.
Division 26 - Electrical, Exterior Lighting, Site Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents