Similar Projects
Install Approximately 200 Feet of 6 Feet Chain Link Fence and Three Slide Gates with Access Control
Alteration
Bidding
Carthage, MO

Perimeter Fence Upgrades
Renovation, Alteration
Bidding
Kansas City, MO 64116

Replace Damaged Fence Line Sections and Brick Pillars
Alteration
Post-Bid
Kansas City, MO 64106

Replace Damaged Fence Line Sections and Brick Pillars
Alteration
Post-Bid
Kansas City, MO 64106

Barbed Wire Fencing Near the Noble Hill Sanitary Landfill
Results
Springfield, MO

Recycling Center Fence
Term Contract
Results
Hillsboro, MO 63050

Big River Saddle Club Fence
Alteration
Bidding
Dittmer, MO 63023

Installation of Electronic Rolling Cantilever Gate
Alteration
Post-Bid
Saint Louis, MO

Dumpster Enclosure
Alteration
Results
O Fallon, MO

Brentwood Fencing Replacement
Demolition, Alteration
Post-Bid
Brentwood, MO 63144

Grand Glaize WWTF Transformer and Gate Replacement
Alteration
Results
Saint Louis, MO

Fence Material for Progress Park Baseball Field Improvements
Alteration
Post-Bid
Wentzville, MO

Install a Cantilever Gate
Alteration
Results
MO

California Gardens Fencing And Security
Alteration
Post-Bid
Saint Louis, MO

MODOT Kansas City Skiles Fence Project
Alteration
Results
Kansas City, MO 64134

Last Updated 01/28/2022 11:14 AM
Project Title

Four Rivers Conservation Area Unit 3 Structure Gate Repairs and Four Rivers CA Water Control Gate Replacements - Phase II

Physical Address View project details and contacts
City, State (County) Rich Hill, MO 64779   (Vernon County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes all materials, labor, dewatering, and equipment necessary to remove and demolish seven (7) water control gates in the Unit 3 Water Control Structure, and then furnish, deliver, and install seven (7) new water control gates to replace those removed as specified by the contract documents. Project #82-38-39: This project includes all materials, labor, dewatering, and equipment necessary to remove and demolish fourteen (14) water control gates, and then furnish, deliver, and install fourteen (14) new water control gates to replace.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents