Similar Projects
Y--Slick Rock Culverts
Design
$200,000 to $400,000 est. value
Safford, AZ

Route N9702-Sawmill/Whiteclay
Post-Bid
Sawmill, AZ

Annual Culvert Pipe
Term Contract
Post-Bid
Safford, AZ 85546

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

F--Navajo Nation-Cove Mesa II Erosion Control
Results
$1,000,000 to $5,000,000 est. value
Red Rock, AZ

Phase 1 - Infrastructure AKA Hillside Drive
New Construction
Construction
Phoenix, AZ 85338

Indefinite Delivery / Indefinite Quantity (IDIQ) Irrigation Canal Construction
Post-Bid
$250,000 to $1,000,000 est. value
San Luis, AZ

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

Subgrade Preparation, Road Reconditioning, Soil Stabilization, Gravel Base, Double Chip Seal and Signage
Post-Bid
Window Rock, AZ 86515

Upper San Simon Culvert Bridge Replacement
Results
Safford, AZ

Subgrade Preparation, Road Reconditioning, Gravel Base, Double Chip Seal, Culvert Installation and Signage
Post-Bid
Window Rock, AZ 86515

Colorado River Wash Fan Sediment and Rock Removal IDIQ for Arizona, California and Nevada
Results
$250,000 to $1,000,000 est. value

Route N6730 - Tolani Lake Chapter; Low Water Crossing
Post-Bid
Window Rock, AZ

Western Canal Crossing Improvements
Results
Less than $97,855 est. value
Chandler, AZ

Parking Lot Drainage
Post-Bid
Window Rock, AZ 86515

Reported 02/15/2020 12:00 AM
Project Title

Design and Construct a Drainage System

Physical Address View project details and contacts
City, State (County) AZ   (Navajo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking services from a licensed contractor to design and construct a drainage system. The construction is crucial to ensuring the longevity of the parking lot and modular foundation. The parking lot drainage system does not have positive drainage flow and currently collects pools of water, including snow and ice. When the water collects, it creates problems for pedestrians and vehicles. NNSMP is requesting a drainage system in two locations. The drawing Exterior Drainage Plan provides an overview of the locations.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents