Similar Projects
Contract for Ductile Iron Fittings
Post-Bid
Roanoke, VA 24012

Contract for Miscellaneous Parts and Fittings
Post-Bid
Roanoke, VA 24012

Lee Highway Transmission Main Project
Results
Fairfax, VA

Ridgeview Water Main Upgrades Project
Results
Middleburg, VA

Zion Crossroads Water Booster Station and Wastewater Pump Station
Construction
Palmyra, VA

American Water - Prince Street Water Line Replacements
Construction
Alexandria, VA 22314

Waterline Installation along Blackwell Road
Post-Bid
Warrenton, VA 20186

Long Hollow Water System Improvements
Results
VA

LSG Sky Chefs - DCA Trench Drain & Concrete Replacement
Renovation
Construction
Arlington, VA 22202

On-Call Construction of Storm, Sanitary, Water Mains Improvement
Post-Bid
Arlington, VA 22201

Installation Of New Water Facilities
Results
$6,000,000 to $8,000,000 est. value
Richmond, VA

Windsor / Custis Avenue 16” Transmission Main
Renovation
Construction
Alexandria, VA 22314

Utilities On-Call Services
Term Contract
Post-Bid
VA

Furnish And Deliver 3" Hydrant Meters
Results
Fairfax, VA

Scottsville Phase 3 Water Main Replacement
Construction
VA

Reported 12/13/2018 12:00 AM
Project Title

Max Meadows Bridge-Supported Waterline Replacement

Physical Address View project details and contacts
City, State (County) Wytheville, VA   (Wythe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Shall include the furnishing of all labor, materials, tools, transportation, supplies, equipment and appurtenances necessary for the complete and satisfactory replacement of the existing waterline. Work is to consist of but not limited to: Removal of: existing 6-inch water line and bridge support brackets. Construction of: 250 linear feet of 6-inch insulated ductile iron waterline and bridge support brackets, 135 linear feet of 6-inch buried ductile iron waterline with gate valves, fire hydrant, and connection of new waterline to existing system as shown on the plans and as described in the technical specifications and all related appurtenances
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents