Similar Projects
Roeville Elevated Water Tank - City of Milton
Infrastructure
Conception
$500,000 CJ est. value
Milton, FL 32570

Highway 87 South Forcemain - City of Milton
Infrastructure
Conception
$300,000 CJ est. value
Milton, FL 32570

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Florida Small Cities Community Development Block Grant (CDBG) Project
Infrastructure
Bidding
$900,000 CJ est. value
Milton, FL 32570

Florida Small Cities Community Development Block Grant (CDBG) Project
Infrastructure
Bidding
$900,000 CJ est. value
Milton, FL 32570

Culver's / Milton
New Construction, Infrastructure - 4,640 SF
Sub-Bidding
$1,300,000 CJ est. value
Milton, FL 32570

Milton Downtown Waterfront Marina, Residential and Mixed-Use Development Opportunity
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Milton, FL 32570

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

8-Inch Bypass Pump For Sundial Utilities
Infrastructure, Alteration
Results
Milton, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

Tiger Point School - Santa Rosa County School District
New Construction, Infrastructure
Pending Verification
$5,300,000 CJ est. value
Gulf Breeze, FL 32563

Oasis Resort and Escape Family Center
New Construction, Infrastructure - 30,000 SF
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

Last Updated 06/12/2023 12:05 PM
Project Title

Resurfacing - SR 89

Physical Address View project details and contacts
City, State (County) Jay, FL 32565   (Santa Rosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $6,987,787 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Santa Rosa Road Name: Resurfacing Limits: 58060000 Project(s): 44559015201(*) Federal Aid No: N/A Total Roadway Length: 12.933 Miles Contract Days: 195 Total Bridge Length: 0.000 Miles Total Proposal Length: 12.933 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Standard Acq The Improvements under this District Contract consist of milling and resurfacing of SR 89 from N of SR 87 North to S of CR 178 in Santa Rosa County. Other improvements under this project include turnout widening, minor drainage improvements, guardrail and signing and pavement markings. Pre-qualification is Required to Bid on This Project For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 004 Resurfacing - SR 89

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents