Similar Projects
Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

On-Call Emergency Soil Repair
Term Contract
Results

Traffic Control - Bridge
Term Contract
Results

Pipe Flushing and Video
Term Contract
Results

Precast Concrete Slab
New Construction
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Steel Rolled Beams Superstructure
New Construction
Results

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

SGR - Culvert Replacement
Infrastructure
Results
$1,333,000 est. value
VA

Salt Pond Liner Installation
Term Contract, Infrastructure
Results

Aluminum Arch Pipe
Infrastructure
Results

Aluminum Structural Plate Arch Pipe And Aluminum Structural Plate Headwalls - Fabrication, Delivery, Assembly And Installation Supervision
Infrastructure
Results

Last Updated 11/04/2021 03:45 PM
Project Title

Roanoke River Greenway - Bridge the Gap Phase II Segment 2

Physical Address View project details and contacts
City, State (County) Roanoke, VA   (Botetourt County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is generally described as the installation of 268 feet of pedestrian bridge across Roanoke River and approximately 5,700 feet of paved greenway and associated work starting from an existing bridge abutment (previously built in Phase II Segment 1) located near Norfolk Southern Material Yard and terminating at an existing greenway trailhead located at Bridge Street.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents