Similar Projects
Rehabilitation of Water Storage Facilities
Infrastructure
Bidding
$1,100,000 est. value
Lynnfield, MA 01940

Extended Contract for the Inspection, Maintenance, Repair or Modifications of Water Storage Facilities
Infrastructure
Bidding
$3,000,000 est. value
Marlborough, MA 01752

Supply and Installation of an Ice Bridge at the Indian Head Heights Water Storage Tank Site
Post-Bid
Less than $40,000 est. value
Framingham, MA

Water Tanks Maintenance and Asset Management
Term Contract
Post-Bid
Canton, MA

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Seekonk High School Domestic Hot Water Tank
Infrastructure
Post-Bid
$80,000 est. value
Seekonk, MA 02771

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

New Biofilter for EQ/Sludge Tank
Infrastructure
Post-Bid
Wareham, MA 02571

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Storage Facility - Smith Neck Road Elevated Tank
Infrastructure
Post-Bid
$1,500,000 est. value
Dartmouth, MA

CACO - Temporary Potable Water Storage
Results
Wellfleet, MA

Water Filter Plant Bulk Tank Installation
Infrastructure
Post-Bid
$15,000 est. value
Southbridge, MA

Allen Street Standpipe
Term Contract
Results
Less than $300,000 est. value
Dartmouth, MA

Last Updated 03/10/2022 09:56 AM
Project Title

Town Hill Water Storage Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Ipswich, MA 01938   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Town Hill Water Storage Tank Replacement Project. Construction of a 3 million gallon prestressed concrete water storage tank, valve vault and controls building, and demolition of existing 3 million gallon welded steel tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents