Similar Projects
Last Updated | 09/14/2020 05:52 AM |
Project Title | Marina Dock Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Isle of Palms, SC 29451 (Charleston County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the contractor shall include the following in their scope of work: 1. Demolition of all docks and water-side appurtenances on the Morgan Creek portion of the site (piling, gangways, floating docks, fixed piers, and utilities). Include removal of all piling below the mudline. 2. Design, furnish and install new floating dock system and associated anchorage 3. Design, furnish and install gangways as well as associated connections, platform, etc. 4. Furnish and install all marine electrical system components to and including upland panels and equipment 5. Furnish and install marine fuel system from the bulkhead adjacent connection out (as indicated on the plans) 6. Furnish and install potable water and sewer system on docks and up gangways to the upland connection points 7. Furnish and install fire protection system to serve the new dock system 8. Design/build services for on-dock fuel hut. 9. Related work as indicated in the plans and specifications to provide fully functioning dock and marine utility systems. 10. The work may also include, at the discretion of the City, selected alternates such as the re-coating of the steel sheet pile bulkhead (or portions thereof), additional utility work, alternate floating dock decking, etc. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |