Similar Projects
Furnish and Install A Dock at Pack's Landing
Bidding
Rimini, SC

Wooden Seawall - Dewits Bluff Landing
Bidding
Pamplico, SC 29583

Replacement of the Folly Beach Fishing Pier
Post-Bid
Folly Beach, SC 29439

Labor to Replace Decking at Abernathy Waterfront Park
Post-Bid
Clemson, SC 29631

Enterprise Boat Landing Parking Area Repair and Resurfacing Project
Results
Less than $205,379 est. value
Conway, SC 29588

Fishing Dock Replacement at James Island County Park
Results
Charleston, SC 29412

The Waterfront
New Construction
Construction
Daniel Island, SC

Construction of The Mount Pleasant Memorial Waterfront First Responders Monument
Bidding
Mount Pleasant, SC 29464

Building ADA Compliant Ramp
Post-Bid
Less than $20,000 est. value
Rembert, SC

Constitution Park Bulkhead Repairs Project
Results
Georgetown, SC 29440

Citadel Marina Maintenance - 2020 Phase I CDF Drying Project
Post-Bid
$80,000 to $100,000 est. value
Charleston, SC 29409

Fort Johnson Boat Slip Repairs
Results
$589,344 to $648,279 est. value
Charleston, SC 29422

Cooper River Marina Dock Repairs
Post-Bid
Charleston, SC 29403

South Island Ferry Boat Landing Dock Replacements and Additions
Results
Less than $372,720 est. value
Georgetown, SC 29440

Battery Pringle Revetment Renovation Project. The Dill Property
Renovation
Post-Bid
James Island, SC

Last Updated 09/14/2020 05:52 AM
Project Title

Marina Dock Rehabilitation

Physical Address View project details and contacts
City, State (County) Isle of Palms, SC 29451   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the contractor shall include the following in their scope of work: 1. Demolition of all docks and water-side appurtenances on the Morgan Creek portion of the site (piling, gangways, floating docks, fixed piers, and utilities). Include removal of all piling below the mudline. 2. Design, furnish and install new floating dock system and associated anchorage 3. Design, furnish and install gangways as well as associated connections, platform, etc. 4. Furnish and install all marine electrical system components to and including upland panels and equipment 5. Furnish and install marine fuel system from the bulkhead adjacent connection out (as indicated on the plans) 6. Furnish and install potable water and sewer system on docks and up gangways to the upland connection points 7. Furnish and install fire protection system to serve the new dock system 8. Design/build services for on-dock fuel hut. 9. Related work as indicated in the plans and specifications to provide fully functioning dock and marine utility systems. 10. The work may also include, at the discretion of the City, selected alternates such as the re-coating of the steel sheet pile bulkhead (or portions thereof), additional utility work, alternate floating dock decking, etc.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents