Similar Projects
MYR Ga Fuel Farm Additions / Improvements
Alteration
Bidding
Myrtle Beach, SC 29577

Fuel Line Replacement
Term Contract
Bidding
Charleston, SC 29412

Brine Tank Addition
Addition
Post-Bid
$80,000 est. value
Greenwood, SC 29649

Design/Build Contractor Services Fuel Farm Expansion Program
Post-Bid
Greer, SC

Gasoline and Diesel Tank Replacement
Results
$20,000 to $25,000 est. value
Florence, SC 29506

Natural Gas Main and Service Line Leak Survey
Term Contract
Results
Fountain Inn, SC 29644

Forest Acres Elementary School Kitchen Cookline Conversion to Natural Gas
Alteration
Post-Bid
Easley, SC 29642

Wooden or Metal Deck Airport Fueling Tank
Results
Spartanburg, SC

API 653 Tank Cleaning and Inspection Charleston AFB, South Carolina
Term Contract
Post-Bid
Charleston AFB, SC

Charleston AFB Tank Inspection
Results
Charleston, SC

Tank Cleaning
Term Contract
Post-Bid
Charleston, SC

Ground Tank Maintenance
Infrastructure
Results
Columbia, SC

Water Treatment Chemical - Chlorine In Ton Containers
Infrastructure
Post-Bid
SC

6" High Pressure Steel Gas Line
Infrastructure
Results
Fountain Inn, SC

Pickens Middle and Hagood Elementary Kitchen Cookline Conversion to Natural Gas
Infrastructure
Post-Bid
Pickens, SC 29671

Last Updated 04/06/2022 11:34 AM
Project Title

Api 653 Tank Inspection - Shaw Afb

Physical Address View project details and contacts
City, State (County) Shaw Air Force Base, SC   (Sumter County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and transfer approximately 150 gallons of fuel/sludge. Any fuel or residual product that will be disposed of the contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. Clean the tank and perform an internal AST inspection to also include the visual inspection of the containment area. Tank cleaning shall be done in accordance with UFGS 33 01 50.60. The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.60, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed. All tank appurtenances that are required shall be documented along with all required appurtenances that aren’t present. Alarms, Automatic Tank Gauge equipment, and all tank appurtenances shall be tested and verified. The attached Inspection Report template should be utilized in submitting both the DRAFT and FINAL inspection reports. Contractor shall leave a clean and orderly site upon the completion of the inspection.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents