Similar Projects
Water Distribution Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Elizabeth, MN 56533

Chandler Park Parking Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Champlin, MN 55316

Pipe Lining
Term Contract
Sub-Bidding
Austin, MN 55912

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

Water Treatment Plant Rehab
Renovation
Bidding
$700,000 CJ est. value
Lake Lillian, MN 56253

Plumbing Services 2022
Alteration
Post-Bid
Saint Paul, MN

Architectural/Engineering Services for Student Center & Library
Renovation, Infrastructure, Alteration - 8,995 SF
Results
$786,000 est. value
Saint Paul, MN 55106

Public Safety Facility Shower Refurbishment
Alteration
Post-Bid
$50,000 est. value
Minneapolis, MN 55415

Goodview Avenue Water Main Extension
Infrastructure
Results
$2,270,208 CJ est. value
Cottage Grove, MN 55016

Pipe and Equipment Insulation Services
Alteration
Post-Bid
Mankato, MN

Palmer Creek Estates Stream Restoration
Infrastructure
Results
$558,098 CJ est. value
Plymouth, MN 55442

PW-Install Pipe Insulation on Eyewash/Shower Stations
Alteration
Post-Bid
$300,000 est. value
Minneapolis, MN

Last Updated 07/13/2023 06:38 AM
Project Title

Main Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Watkins, MN 55389   (Meeker County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,142,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Control system integrator is responsible for providing all control hardware, PLC's, graphical interfaces, measuring devices and instrumentation, control panels, computer hardware, programing, calibration, testing and all other work needed for a fully operating control system. Description: 1. Demolish existing lift station including wet well, dry well, all equipment, and controls; 2. Demolish existing control building; 3. Construct new lift station including wet well, valve/meter vault, controls, and all associated sewer and forcemain lines to connect to existing system; We performed our scope of services for the project in accordance with our Proposal Mr. Louwagie dated March 16, 2023, and authorized on March 17. The following list describes the geotechnical tasks completed in accordance with our authorized scope of services. Reviewing the background information and reference documents previously cited. Staking and clearing the exploration location of underground utilities. Bolton & Menk, Inc. selected and we staked the new exploration location. We acquired the surface elevation and location with GPS technology using the State of Minnesota's permanent GPS base station network. The Soil Boring Location Sketch included in the Appendix shows the approximate location of the boring. Performing one standard penetration test (SPT) boring, denoted as ST-1 to a nominal depth of 36 feet. Preparing this report containing a boring location sketch, logs of soil borings, a summary of the soils encountered, and recommendations for structure subgrade preparation and the design of the base slab. We performed this geotechnical evaluation concurrently with a Pre-Demolition Hazardous Building Materials Inspection which we will submitted under separate cover. The scope of our services was limited to: Visually examine accessible areas and identify locations of suspect asbestos-containing materials (ACM), lead-based paint (LBP), polychlorinated biphenyls (PCBs), mercury, and other miscellaneous hazardous material. Collect and analyze representative bulk samples of materials suspected of containing asbestos. Conduct limited LBP testing of potential re-useable components with painted surfaces suspected of containing lead (where applicable). Testing was accomplished by collecting paint chip samples and analyzing them for lead content. Assign a hazard rating based on asbestos content with respect to the materials condition, friability, accessibility, and hazard potential. Document the various materials' current conditions and estimated ACM quantities based on visual observation. Generate a final report documenting the sample locations, analysis results, conditions, estimated ACM quantities and recommendations.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents