Similar Projects
RFP Engineering - Select Design Engineering Services for the NE 182nd Ave and NE Risto Road Improvements
Infrastructure
Conception
$490,000 CJ est. value
Vancouver, WA 98660

Salmon Creek Memory Care
New Construction, Infrastructure - 81,410 SF
Bidding
$15,000,000 CJ est. value
Vancouver, WA 98686

Berth 17 Rehabilitation Project
Infrastructure
Bidding
$13,994,400 CJ est. value
Vancouver, WA 98660

Westside WWT Backflow Prevention Improvement
Infrastructure
Post-Bid
Vancouver, WA 98660

NE 45th St - NE 106th Ave to NE 109th Ave Water Main Replacement
Infrastructure
Post-Bid
Vancouver, WA 98668

Water Meter Changeout
Infrastructure
Results
WA

North East 49th Street Water Main Replacement North East 15th Avenue
Infrastructure
Results
Vancouver, WA 98682

Repaint Pavement Markings in Parking Lots, FOVA
Infrastructure
Bidding
$30,000 CJ est. value
Vancouver, WA 98661

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Results
$4,754,309 CJ est. value
Vancouver, WA 98660

Terminal 3 - 2022 Paving Project
Infrastructure
Bidding
$331,350 CJ est. value
Vancouver, WA 98660

Fire Hydrants and Storz Adapters
Infrastructure
Post-Bid
Vancouver, WA

Building 2565 Fire Sprinkler System Replacement
Alteration
Results
$509,190 to $562,790 est. value
Vancouver, WA 98660

Region 5 Headquarters Ridgefield Office Mezzanine Project
New Construction, Infrastructure
Bidding
$140,000 CJ est. value
Ridgefield, WA 98642

Building 3201 Fire System Flush
Alteration
Post-Bid
$37,685 est. value
Vancouver, WA 98660

Last Updated 07/28/2022 06:05 PM
Project Title

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98660   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $95,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all the necessary equipment, labor, materials, and permits to improve existing backflow prevention devices on the Westside WWTF potable water fire protection system. The work shall be completed in accordance with these special provisions, contract drawings, and contract documents. Questions Due Date: Jul 13th 2022, 3:00 PM PDT

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents