Similar Projects
Northeast Region-Wide Deck Sealing FY22, Various Backbone Routes STH
Infrastructure
Bidding

Shawano - Gillett, South County Line - Finnegan Lake Road
Infrastructure
Bidding
WI

Park Avenue Reconstruction
Infrastructure
Post-Bid
$750,000 est. value
Oconto Falls, WI 54154

Park Avenue Reconstruction
Infrastructure
Post-Bid
$750,000 est. value
Oconto Falls, WI 54154

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

West Maple Street Improvements
Infrastructure
Post-Bid
Lena, WI

2021 Flatley Avenue Reconstruction
Results
$605,000 est. value
Oconto Falls, WI

City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

2021 Harbor Road and Splinter Causeway Reconstruction
Results
$2,250,000 est. value
Oconto, WI 54153

T. Underhill, CTH R, Shawano County Line - CTH VV
Results
WI

2021 Splinter Causeway Reconstruction
Results
$1 to $300,000 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Pulaski - STH 22, Pulaski NVL - CTH E; Pulaski - STH 22, CTH E - STH 22
Results
Pulaski, WI

Pedestrian Bridge - Chute Pond Park
Results
WI

Last Updated 02/14/2022 03:30 AM
Project Title

Gillett - Mountain, Trinity Church Road - CTH AA; Suring - Breed, South Branch Oconto River Bridge

Physical Address View project details and contacts
City, State (County) WI   (Oconto County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Milling, Grade, Storm Sewer, Culvert Pipe, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Sidewalk, Beam Guard, Signing, Pavement Marking, and a Structure, Excavation Common, 2,748 CY; Backfill Structure, 150 Ton; Base Aggregate Dense, 6,528 Ton; Concrete Pavement, 3 SY; Concrete Masonry Bridges, 192 CY; Bar Steel Reinforcement Coated, 39,075 Lbs; Marking Epoxy, 158,350 LF; Construction Staking, 62,083 LF; Construction Staking, 109 Each; Construction Staking, 3 LS; Culvert Pipe, 10 LF 15”, 60 LF 18“, 746 LF 24“, 176 LF 30“, 104 LF 36“; Storm Sewer Pipe, 84 LF 10“, 268 LF 12“, 32 LF 15“, 9 LF 21“, 433 LF 24“; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 112 LF 19” X 30”, 160 LF 24” X 38”; Concrete Curb, 371 LF; Concrete Curb and Gutter, 5,309 LF; Concrete Sidewalk, 5,125 SF; Beam Guard, 757 LF; Beam Guard Energy Absorbing Terminals, 6 Each; Asphaltic Surface, 1,845 Ton; HMA Pavement, 52,028 Ton; Removing Asphaltic Surface Milling, 213,555 SY; Tack Coat, 23,504 Gals; Signs, 293 SF; Steel Diaphragms, 10 Each; Culvert Pipe Liners, 147 LF; Riprap, 71 CY; Foundation Backfill, 1,606 CY; PVC Pipe, 18 LF; Protective Thermoplastic Coating at Snowmobile Crossing, 465 SY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents