Similar Projects
Philmnt/Tomlinson/Pine Rd Int
Infrastructure
Conception
$24,196,000 CJ est. value
Lower Moreland Township, PA 19006

District Wide Bridge Rehab Group P
Infrastructure, Renovation
Conception
$8,358,000 CJ est. value
Schwenksville, PA 19473

AutoZone #5334 / East Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

Royal Farms #407 / Lower Pottsgrove Township
New Construction, Infrastructure - 6,628 SF
Design
$2,000,000 CJ est. value
Pottstown, PA 19464

Lower Perkiomen Parks New Maintenance Building
New Construction, Infrastructure - 8,600 SF
Bidding
$2,500,000 CJ est. value
Norristown, PA 19403

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

2022 Infrastructure Improvement Project Group
Infrastructure
Post-Bid
$2,964,985 CJ est. value
Lansdale, PA 19446

Hollow Road Pumping Station Grit System Replacement
Renovation
Results
$225,000 to $275,000 est. value
Penn Valley, PA

Tindey Run Sanitary Sewer Project - Pump Station General/Mechanical
New Construction
Results
Oaks, PA

Mancill Mill Road Apartments
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
King of Prussia, PA 19406

Bala and Highland Avenue Multi Residential
New Construction, Infrastructure - 2,650 SF
Pending Verification
$7,500,000 CJ est. value
Bala Cynwyd, PA 19004

Main Street/SR 29 Ped Improvements
Infrastructure
Conception
$682,000 CJ est. value
Collegeville, PA 19426

N Narberth Avenue O/AMTRAK
Demolition, New Construction, Infrastructure
Design
$10,747,000 CJ est. value
Narberth, PA 19072

RFP D/B - Park and Recreation Building Project
New Construction, Infrastructure - 5,000 SF
Post-Bid
$4,500,000 CJ est. value
East Norriton, PA 19401

Taylor Farm Demolition Project
Demolition, Infrastructure
Results
Royersford, PA 19468

Last Updated 02/01/2023 05:38 AM
Project Title

Swedesburg Pump Station Upgrade - Contract One - General Construction and Contract Two - Electrical

Physical Address View project details and contacts
City, State (County) King of Prussia, PA 19406   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $102,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the removal of the existing pumps and the partial demolition of the drywell portion of the existing pump station, installation of new submersible pumps in the existing wet well, construction of a new Control Building for the site, all required pipe modifications, all electrical modifications, and all site restoration as shown on the Contract Drawings and as specified. The Work will be performed under two Contracts as follows: Contract One - General Construction Contract Two - Electrical Questions will be accepted until 4:00 PM, prevailing time, on Thursday, December 21, 2022; All questions must be submitted through PennBid. -Clarification Deadline: 1/24/2023 4:00 PM The range of the opinion of probable cost (total for the project) is $450,000 to $500,000. The Project generally consists of the removal of the existing pumps and related equipment from the "can" portion of the station and partial demolition and abandonment ofthe drywell portion of the pump station as shown on the Drawings. The project also consists of the replacement of the top precast section of the wet well to install a new top section and installation ofnew submersible pumps inthe wet well as shown on the Drawings, the project also consists ofthe installation ofa precast fabricatedbuilding on a concrete foundationto house a portion ofthe discharge piping and electrical controls, removal ofthe existingjib crane hoist and foundation, relocation ofall electrical components to the new building, and all site restoration work to return the site to its pre-existing condition or better.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents