Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,000,000 est. value
Tacoma, WA 98417

I-5/SB over I-705 and RR - Special Repairs
Infrastructure
Conception
Tacoma, WA 98418

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
New Construction, Infrastructure
Design
$26,186,000 est. value
Tacoma, WA 98417

SR 302/Victor Creek - Remove Fish Barrier
Infrastructure
Design
$2,806,000 CJ est. value
Gig Harbor, WA 98332

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

Bonney Lake 950 Zone Tank and 950 / 1010 Zone Pump Station
New Construction, Infrastructure
Bidding
$8,900,000 CJ est. value
Tacoma, WA 98405

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

I-5, Mounts Road to Steilacoom - DuPont Road - Corridor Improvements
Infrastructure
Post-Bid
$165,000,000 to $195,000,000 est. value
Fife, WA 98424

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Market Street - S. 9th to S. 17th Streets - PWK-NEW-1246 - City of Tacoma
Infrastructure
Conception
$5,000,000 est. value
Tacoma, WA 98402

SR 302/Purdy Bridge - Bridge Rehabilitation
Infrastructure, Renovation
Design
$5,599,000 CJ est. value
Gig Harbor, WA 98332

Potable Water Line Replacement - Clover Park Technical College
Infrastructure
Bidding
$865,000 CJ est. value
Lakewood, WA 98499

Parking / Pedestrian Site Lighting and Stormwater Management Items For Vaal Ph 2A At Jblm, Wa
Infrastructure
Post-Bid
Lakewood, WA

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Last Updated 07/29/2022 01:11 PM
Project Title

2022 Pavement Patching and Chip Seal Application

Physical Address View project details and contacts
City, State (County) Sumner, WA 98390   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $340,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Pavement Patching &Chip Seal Application. The project consists of surfacing existing roadways with designated roadways receiving pavement patching and a chip seal with a fog seal treatment, and other designated roadways receiving only a fog seal treatment. The work takes place on various City of Sumner streets on the attached maps. The work is further described in the Exhibits and Plans attached with this Request for Bids. State Certification is required. Contractor must have proper certifications and licenses and follow all applicable Federal, State and Local codes and regulations. All work shall be completed in conformance with the 2022 WSDOT Standard Specifications for Road, Bridge and Municipal Construction, the current version of the Manual on Uniform Traffic Control Devices (MUTCD), and the City of Sumner Development Specifications and Standard Details.. This project is subject to all provisions of RCW 39.12. Pursuant to RCW 39.08.010, Payment and Performance Bond shall be required for this project. If the project is under $150,000, the contractor may submit a letter on the contractors letterhead stating the contractor is electing to have 10% withheld in lieu of a Payment and Performance Bond (See the attached Contract Sample under XV BOND) Work shall commence within thirty (10) calendar days after execution of the contract and the issuance of a notice to proceed; and shall be completed within fifteen (15) working days. Andrew Leach, Public Works Manager, 253-363-3681, andrewl@sumnerwa.gov. The City of Sumner reserves the right to reject any or all bids, waive technicalities or irregularities and to accept any bid if such action is believed to be in the best interest of the City. The engineer's estimate is between $325,000 and $340,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents