Similar Projects
Boiler Replacement Project
Alteration
Post-Bid
Goldsboro, NC 27530

ECSU - Mechanical System Upgrades - Viking Tower
Alteration
Post-Bid
Elizabeth City, NC

Steam Repairs Phase VIIIC
Results
$1,200,000 to $1,500,000 est. value
Raleigh, NC 27695

Valley Springs Middle School Mechanical Upgrade
Results
Arden, NC 28704

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

ECSU - Mechanical System Upgrades - Jenkins Science
Alteration
Post-Bid
Elizabeth City, NC

Johnston CI Boiler and Water Heater Replacement
Results
$420,400 est. value
Raleigh, NC

ECSU - Mechanical System Upgrades - University Tower
Alteration
Post-Bid
Elizabeth City, NC

Building 2 Hydronic Piping Replacement at Vanstory Elementary School
Results
Fayetteville, NC 28303

ECSU - Mechanical System Upgrades - Williams
Alteration
Post-Bid
Elizabeth City, NC

Chiller/Boiler Pump Replacement and Continuing Education Center
Results
Statesville, NC 28677

Boiler Replacement
Alteration
Post-Bid
Greensboro, NC

Crosby-Garfield Center Mechanical Upfit
Results
Raleigh, NC 27601

Page Hall Mechanical and Electrical Upgrade
Alteration
Post-Bid
$8,200,000 est. value
Raleigh, NC 27607

Pisgah Forest Elementary School Mechanical Piping Replacement
Results
$570,000 est. value
Brevard, NC 28712

Last Updated 10/12/2022 09:37 AM
Project Title

Kings Mountain High School Mechanical Systems Replacement

Physical Address View project details and contacts
City, State (County) Kings Mountain, NC 28086   (Cleveland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 12, 2022. The Project has been awarded to Beam Construction but no awarded amount available as of yet.** Bids will be received for a single prime - all categories. The proposal shall be lump sum. 1. Provide a new air conditioning system for the main building and main gymnasium. The main system type will be dual temperature fan coil units with dedicated outside air. Secondary system types will include roof and pad mounted Dx equipment. 2. Remove all existing building automation and replace. 3. Project shall be phased per documents and bid with base and alternates as listed in project manual. All Base Bid and Alternate Costs shall account for escalation through end of project. 4. The contractor shall provide all temporary construction barriers and maintain egress paths shown. 5. Provide all associated electrical work to accommodate the upgrades to the mechanical systems. 6. Provide all associated work to integrate existing HVAC equipment with the new BAS. 7. All permit costs are to be paid by Contractor and included in the Bid/Alternate costs. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price for all contracts. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days without written consent of owner. The owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents