Similar Projects
Last Updated | 06/02/2022 12:38 PM |
Project Title | 2022-2023 Task Order Contract for Trenchless Corrugated Metal Pipe (CMP) Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX 78275 (Bexar County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | There have been a significant increase in the amount of CMP failures in which these pipes have either become severally corroded or collapsed, resulting in emergency pipe repairs and pavement failures. This contract will rehabilitate failing underground corrugated metal pipe. The CMP rehabilitation would consist of four different methods determined by site criteria. The four methods are spray-on liner, Slipline, Cured-in-place Pipe, and Invert paving. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |