Similar Projects
Last Updated | 03/20/2023 02:35 PM |
Project Title | Schooner Landing Sewer Bypass Project |
Physical Address | View project details and contacts |
City, State (County) | Newport, OR 97365 (Lincoln County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $203,142 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The sewer bypass-system project consists of the installation of a pump station that will be connect to an existing upstream 8 sewer pipe. Downstream from the pump station, a short force main and gravity overflow pipe will discharge to a terminal manhole. From the terminal manhole an 8 HDPE gravity sewer line will be installed and connected to an existing downstream manhole. The following are major items that are required to complete the project. Furnish and install one (1) prefabricated pump station and accessories. Furnish Extra Pump to the City of Newport for future use. Furnish and Install one (1) 48" diameter terminal manhole. Furnish and Install approx. 320 lineal feet of 8" HDPE pipe. Furnish and Install approx. 20 lineal feet of 2" HDPE force main. Furnish and Install approx. 100 lineal feet of 3" electrical conduit. Trench excavation and backfill for piping. Excavation and backfill for structures. Concrete curb, AC Pavement, and landscaping removal and replacement. Connections to existing pipe and manhole The sewer bypass-system project consists of the installation of a pump station that will be connect to an existing upstream 8 sewer pipe. Downstream from the pump station, a short force main and gravity overflow pipe will discharge to a terminal manhole. From the terminal manhole an 8 HDPE gravity sewer line will be installed and connected to an existing downstream manhole. The following are major items that are required to complete the project. To ensure your bid is accepted in its entirety, please combine all documents into a single PDF file attached to your email. Bidders shall be responsible for calling the City office at 541-574-3376 before the proposal deadline to confirm the bid was received. Scanned documents attached to the email shall include the Bid Form (P-400) and all forms identified in Article 6.01 of the Bid Form. A scanned copy of the fully executed bid bond is acceptable for bid submission. Proposals must be received by the City and then at said office publicly opened and read aloud. Bids received after this time will not be accepted. All interested parties are invited to attend the bid opening. Subcontractor declarations must be delivered to Owner as above no later than 4:00 p.m. on the day of the bid opening. No bid will be considered unless fully completed in the manner provided in the Instructions to Bidders, and accompanied by a bid security, executed in favor of the Owner, in the amount not less than 10% of the total amount of the bid. Pre-bid inquiries shall be directed to Chris Beatty, Senior Project Manager, at 541-574-3376 or c.beatty@newportoregon.gov This contract is for public work and is subject to ORS 279C.800 to 279C.870 regarding prevailing wage rates. Licensing under ORS 468A.710 is not required. The contracting agency may cancel the procurement or reject any or all bids in accordance with ORS 279B.100. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |