Similar Projects
Fire Station Number 6 - FM-22-1811 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Pump Station 16 Upstream Interceptor Rehab - MS-21-0022 - City of Lawrence
Infrastructure
Conception
$1,170,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Baldwin City, KS 66006

Heritage Streetscapes
Infrastructure
Bidding
$200,000 CJ est. value
Andover, KS 67002

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

North Lawrence Water Supply Redundancy Project
Infrastructure
Post-Bid
Lawrence, KS

Water System Improvements
Results
Cambridge, KS

714 Main Rehabilitation
Infrastructure
Results
Eudora, KS

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

Plastikon Healthcare Expansion
Addition, Infrastructure - 17,000 SF
Pending Verification
$1,200,000 CJ est. value
Lawrence, KS 66046

Concrete Channel West of Arrowhead Princeton to Peter - MS-21-0012 - City of Lawrence
Infrastructure
Conception
$1,500,000 CJ est. value
Lawrence, KS 66049

Eagle Bend and YSC Irrigation Water Supply Project - MS-20-0012 - City of Lawrence
Infrastructure
Design
$1,100,000 CJ est. value
Lawrence, KS 66044

2023 Street Resurfacing Project
Infrastructure
Bidding
$800,000 CJ est. value
Great Bend, KS 67530

Last Updated 01/04/2023 11:40 AM
Project Title

Hickok Park - Storm Sewer End Sections

Physical Address View project details and contacts
City, State (County) Hays, KS 67601   (Ellis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $27,808 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hays Public Works Department is accepting Bids for the rehabilitation of storm sewer infrastructure at Hickok Park in the City of Hays, KS. Improvements consist of resetting two (2) 54" RCP End Sections and one (1) section of 54" RCP, remove existing concrete apron, remove three trees, remove approximately 130 CY of sand bar and regrade drainage channel, construct 20 LF of toe wall, install 45 tons of 6"-12" Rip Rap, install erosion control mat and reseed all disturbed areas.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents