Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure - 278,212 SF
Design
$33,000,000 CJ est. value
Forney, TX 75126

Atmos Service Center
New Construction - 16,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Forney, TX

Heartland Town Center Buildings A-C (Mesquite)
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Forney, TX 75126

Annual Contract Chip Sealing of County Roads
Infrastructure
Bidding
$725,000 CJ est. value
Post Oak Bend City, TX 75142

Grading Improvements for Eastland, Phases 1B and 1C
Infrastructure
Post-Bid
TX

Earthwork Improvements to Serve Arbordale Village 2
Infrastructure
Post-Bid
TX

2019-2020 TxCDBG Drainage Improvements
Infrastructure
Results
$171,605 CJ est. value
Kemp, TX 75143

Walden Pond West Phase 1 Grading Improvements
Infrastructure
Results
TX

U-Rent It
New Construction - 33,120 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Terrell, TX 75160

A-Affordable Storage
New Construction - 408,000 SF
Construction
$3,000,000 est. value
Terrell, TX 75160

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Business Park / Forney
New Construction, Infrastructure - 1,100,000 SF
Pending Verification
$46,000,000 CJ est. value
Forney, TX 75126

Stream Mesquite - SRPF c/ Trinity Pointe Phase 1, LP -Building 1
New Construction - 293,548 SF
Design
$11,300,000 est. value
Forney, TX 75126

Construction of the Grading Improvements or Wildcat Ranch, Phase 4
Infrastructure
Post-Bid
TX

Walden Pond South Phase 1 Grading Improvements
Infrastructure
Results
TX

Last Updated 03/17/2023 12:03 PM
Project Title

Lions Den Self Storage Phase 2

Physical Address View project details and contacts
City, State (County) Kaufman, TX 75142   (Kaufman County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $696,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 2023, construction is underway.

Details

23,200 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents