Similar Projects
System Preservation (Restoration/Rehab/Resurface)
Infrastructure
Bidding
$5,900,000 est. value
AZ

Roads NFSR 100 Surfacing and Stabilization
Infrastructure
Bidding
$250,000 to $500,000 est. value
Gray Mountain, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $1,900,000 est. value
Cameron, AZ

Fourth Street Reconstruction Project
Results
Flagstaff, AZ 86004

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Fredonia Highway (US 89A) (Sr 67 Jct to Nf-248d)
Infrastructure
Bidding
$5,900,000 est. value
North Rim, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Dry Creek Road Shared Use Path Improvements
Results
Less than $669,185 est. value
Sedona, AZ 86336

Flagstaff-Ash Fork Highway (I 40) (E Ash Fork Ti - Devil Dog Road)
Infrastructure
Bidding
$10,500,000 est. value
Williams, AZ 86046

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

JOC - Street Maintenance Projects
Results
Sedona, AZ

Prescott - Flagstaff Highway (SR 89A) (SR 89 - Mp 322)
Infrastructure
Bidding
$4,300,000 est. value
Sedona, AZ 86351

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Last Updated 04/21/2022 07:02 AM
Project Title

Pavement Preservation

Physical Address View project details and contacts
City, State (County) AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,820,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is located in Coconino County on US 89, from a half mile south of the US 89 / SR 98 intersection (Milepost 545.78) to the Arizona/Utah State Line (Milepost 556.99). The work consists of milling and replacing existing asphaltic concrete, pavement marking and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents