Similar Projects
Childrens Lake - Dam Rehabilitation and Improvement
Renovation
Bidding
$2,000,000 to $3,000,000 est. value
Boiling Springs, PA 17007

Gallery Tunnel Improvements at Southwest WPCP
Renovation
Bidding
$1,000,000 to $2,000,000 est. value
Philadelphia, PA 19153

INDUSTRY DAY EVENT - US Army Corps of Engineers Pittsburgh District, Lower Monongahela Dam Removal
Demolition
Post-Bid
Pittsburgh, PA

RFI - Monongahela River, Lock and Dam 3 Decommissioning
Renovation
Post-Bid

Stilling Basin Repair, Foster Joseph Sayers Dam, Beech Creek, PA
Results
$1,000,000 to $5,000,000 est. value
Beech Creek, PA 16822

Stoplog & Bulkhead Fabrication, Delivery, Installation and Testing
Results
Leesport, PA

Intake Structures Rehabilitation Project
Renovation
Bidding
DuBois, PA

Mansfield Levee Repair in Mansfield, Pennsylvania
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Mansfield, PA

Multiple Locations Dam Rehabilitation Project
Results
PA

Repairs to Inflatable Dam
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value

Middle Dam D45-003 Rehabilitation
Results
PA

Replace Outlet Structure - Memorial Lake State Park
Results
$100,000 to $500,000 est. value
PA

Remove Six Dam Structures (Design/Build Project)
Results
$5,000,000 to $20,000,000 est. value

Underwater Repairs at the Gate House of Knight Dam
Results
Green Lane, PA 18054

Sand Spring Run Dam Repairs
Renovation
Results
$100,000 to $500,000 est. value
PA

Last Updated 02/25/2022 04:11 PM
Project Title

Lock Control System Modernization, Lock and Dam #5, Allegheny River, Freeport, PA

Physical Address View project details and contacts
City, State (County) Freeport, PA   (Armstrong County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the upgrade of the lock control system at Allegheny Lock and Dam #5, Allegheny River, Armstrong County, PA. The contract generally includes removal of the existing DeviceNET lock control infrastructure and installation of a new, interlocked control system communicating through a combination of hardwiring and Ethernet/IP. The major features of the requirements are identified below: The contract specifically includes: Removal of all DeviceNET infrastructure, cabling, and devices; Removal of existing HMI’s and PC based PLC clients; Supply and installation of new HMI’s and operator controls into existing enclosures in both control shelters; Removal of existing SLC 500 processor and associated components; Supply and installation of new PLC and associated components; Programing of new PLC processor and HMI’s with modified versions of existing programs; Supply and installation of new interlock panel enclosure including hardwired interlock controls and remote PLC I/O; Removal of existing miter gate control VFD’s from MCC; Supply and installation new gate control VFD’s with Ethernet/IP communication protocol into existing MCC; Removal existing valve actuator control heads; Installation of new Government-Furnished valve actuator control heads; Installation of new communication wiring to valve actuators and miter gate control I/O; Removal existing limit switches for miter gate feedback; Installation of new limit switches for miter gate feedback; Integration of new system with existing fiber optic communication cabling; The work is to be performed using the existing valve actuator control heads stored at the project site. Disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chamber is currently operated by appointment and seasonally, mostly on weekends, from 8 am to 8 pm.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents