Similar Projects
New Ground Water Storage Tank
New Construction, Demolition
Bidding
Loda, IL 60948

Ogden Gardens Water Storage Tank and Building
Infrastructure
Bidding
IL

Z2NE--Upgrade Facility Water - Smith Hafeli Inc - MA VA Medical Center
Post-Bid
Marion, IL

Water Tower Cleaning
Term Contract
Post-Bid
Oswego, IL 60543

Elevated Water Storage Tank
Results
Gardner, IL 60424

Elevated Tank Improvements
Results
Pecatonica, IL 61063

Water Tower Cleaning
Post-Bid
Colona, IL

State Street And Seven Hills Elevated Water Storage Tanks Rehabilitation
Renovation
Results
O'Fallon, IL 62269

New 250,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $1,310,000 est. value
Carrollton, IL

Water Tank, Hydronic Pump and Vav Box Upgrades at Independence Grove
Results
Libertyville, IL 60048

Protective Coating Restoration for 500,000 Gallon Elevated Water Storage Reservoir Along with Ground Storage Reservoir and Miscellaneous Concrete at Water Treatment Plant
Post-Bid
Centralia, IL

First Street Water Treatment Plant Brine Tank Replacement
Renovation
Results
Less than $480,000 est. value
Woodstock, IL 60098

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

Southwest Elevated Tank Repairs
Results
Less than $440,000 est. value
Belvidere, IL 61008

100,000 Gallon Elevated Tank Rehabilitation
Post-Bid
Marion, IL

Reported 08/03/2021 12:00 AM
Project Title

Union Pacific Water Tower - Proviso Yard And Global II

Physical Address View project details and contacts
City, State (County) Melrose Park, IL 60160   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Bids by Invitation.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of water tower at the Proviso Yard and Global II factory. Proviso Yard: 250,000 Gallon water tower rehabilitation including sandblasting, painting, grounding, cathodic protection and structural repairs. Water Tower Pump House Electrical Upgrades. Water Tower Pump House Mechanical Upgrades. Global II Facility: 100,000 Gallon Water Tower Rehabilitation including sandblasting, painting, grounding, cathodic protection and structural repairs.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 03 - Concrete, Maintenance of Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Steel Framing.
Division 07 - Thermal and Moisture Protection, Roofing and Siding Panels.
Division 10 - Specialties, Schedules for Specialties, Schedules for Information Specialties, Exterior Signage Schedule, Interior Signage Schedule, Signage.
Division 22 - Plumbing, Plumbing Piping.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Electrical Controls and Relays.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents