Similar Projects
SGR - Bridge Replacement Over East Branch Thumb Run
New Construction, Infrastructure
Bidding
$1,968,000 est. value
VA

SGR - Bridge Rehab Over North Fork Holston River
New Construction, Infrastructure
Bidding
$520,000 est. value
VA

Repair Pentagon Transit Center (PTC) Bridge
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

Bridge Maintenance (Sump Pump Installation)
New Construction
Post-Bid
Norfolk, VA 23523

SGR - Bridge Beam End Repairs Over Railroad
Results
Less than $2,000,000 est. value

SGR - Bridge Beam End Repairs Over Railroad
Results
Less than $2,000,000 est. value

Bridge Rehabilitationover Clinch River
New Construction, Infrastructure
Bidding
$6,678,000 est. value
VA

Purchase and Delivery of Bridge Material for Staggerweed Road Bridge
New Construction
Post-Bid
Hurley, VA 24620

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Roanoke River Greenway Bridge Across
Results
Roanoke, VA 24011

Bridge Replacement on Street Andrew Street Over Lieutenant Run
Results
Ettrick, VA 23803

SGR - Bridge Replacement over Cove Creek
Results
Less than $16,999,000 est. value
VA

Bridges Over Route 360 Bus and Norfolk Southern Railway
Results
Less than $10,551,000 est. value
VA

West Glebe Road Bridge
Results
$6,500,000 to $12,000,000 est. value
Arlington, VA

SGR - Bridge Replacement Over Blackwater River
Results
Less than $16,848,000 est. value

Last Updated 11/15/2021 01:08 AM
Project Title

Benjamin Harrison Bridge New Generator

Physical Address View project details and contacts
City, State (County) Hopewell, Prince George, VA 23860   (Prince George County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

East side of Route 156 and located on VDOT’s right-of-way between the roadway and Jordan Point Marina (address for the marina: 101 Jordan Point Road, Hopewell, VA 23860). The project is generally described as including but not limited to the removal and replacement of the failing bridge generator which is currently located and attached to the bridge structure. A new generator and single story pre-engineered/pre-cast building enclosure will be constructed on the south end of the bridge.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents