Similar Projects
Alameda County Fire Department Training Center - #20142 - Alameda County
New Construction, Infrastructure
Conception
$30,056,880 CJ est. value
Dublin, CA 94568

7TH/Anthony Traffic Signal Project - PWTRCT1605 - City of Berkeley
Infrastructure, Alteration
Conception
$1,414,500 est. value
Berkeley, CA 94710

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

High Friction Surface Treatment
Infrastructure
Bidding
$3,540,000 CJ est. value
Sunol, CA 94550

Achieve Academy - GMP Proposal
Demolition, New Construction, Renovation, Infrastructure - 49,000 SF
Sub-Bidding
$9,000,000 CJ est. value
Oakland, CA 94601

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

IDIQ MACC for Natural Gas and POL Fuel System Projects at Various Government Installations within the NAVFAC SW Area of Responsibility
Renovation
Post-Bid
$50,000 to $10,000,000 est. value

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Hayward Maintenance Complex (Phase 2) Civil Grading
Infrastructure
Results
$20,000,000 to $40,000,000 est. value
Hayward, CA

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 348,850 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

Piling Replacements - PRWT122012 - City of Berkeley
New Construction, Infrastructure
Conception
$1,500,000 est. value
Berkeley, CA

Last Updated 10/17/2022 09:31 AM
Project Title

USFS Ceiling Tile Replacement

Physical Address View project details and contacts
City, State (County) Redding, CA 96002   (Shasta County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $47,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All questions must be submitted in writing, via email, to the POC's listed below, no later than August 26, 2022, no additional questions will be accepted. No site visit will be scheduled for this requirement. POP 16-SEP-2022 TO 30-MAR-2023 Project Address: 6101 Airport Rd, Redding, CA 96002 Project Scope: Asbestos Inspection Dear Mr. McBroome, Guzi-West certified asbestos personnel collected suspect asbestos-containing material samples at the structure referenced above on June 1, 2021. Following sample collection, the samples were submitted under chain-of-custody documentation to a California-certified laboratory for analysis by polarized light microscopy. As evidenced by the attached laboratory report, asbestos was identified in the following materials and locations: o Brown Ceiling Tile Mastic/Workshop Ceiling (2% Chrysotile Asbestos) o Brown Ceiling Tile Mastic/Workshop Ceiling (2% Chrysotile Asbestos) o Beige Cementitious Siding/Exterior Workshop Siding (35% Chrysotile Asbestos) Guzi-West recommends certified asbestos abatement workers remove the asbestos-containing materials from the affected areas and ensure proper disposal. We will follow up with a project invoice within 7 business days. Thank you for the opportunity to work on the project, and feel free to call/e-mail if you have any questions. NOTE: All invoices must reflect the contract order number and invoice number and the final invoice must be marked "FINAL". Contract Payments: The Government shall pay the Contractor upon submission of proper invoices for services delivered and accepted for the portion of the work actually performed under the contract. Payment shall be made as indicated in the contract's Payment Schedule not on percentage of completion. Deliverables as defined in the Payment Schedule of the contract must be accepted by the Government before payment will be made. Payment estimates must be submitted no more often than monthly. Percentages billed must not be calculated beyond two decimal places for each line item on a payment estimate. Each line item must give a detailed description of: The work item being invoiced The negotiated amount The percentage of work completed for the billing period And earnings to date Please refer to the award document for necessary submittals prior to submitting payment estimates. 4.0 WORK TO BE PERFORMED 4.1 Service Scheduling. Within seven (7) days after award of contract, the contractor shall submit to the COR, for approval, a service schedule indicating the time and sequence of work. If unforeseen events cause a variation in the scheduled service, the contractor shall notify the COR in advance of the delay or as soon as possible if unable to notify in advance. Failure to provide the service or variation from the agreed schedule will require written explanation by the contractor. If and when additional service(s) are added, the schedule will be modified. 4.2 Abatement Work Tasks. The specific Asbestos Containing Material (ACM) to be abated is identified in Appendix B - Asbestos Test Results. 4.3 Breakdown of scope of work is as follows: (Appendix A, contractor shall field verify all existing conditions). W9123822Q0034 Page 48 of 67 The workshop repairment consist of removing and replacing ceiling tiles, substrates, wood molding, paint walls and replace anything damaged while repairing the components identified within the Workshop Building for the U.S. Forest Service at Redding, CA. Contractor must coordinate with PSW, through the COR, to clear out spaces for work related with ceiling replacement unless Optional CLINs (see 4.4) are exercised. The following is a breakdown of work to be performed. Contractor is advised to visit site for field verification (3.2 Inspections): REMOVE Remove existing 12" X 12" tile and mastic, repair ceiling substrate as required to install new ceiling tile. Abate asbestos. Remove existing Light Fixtures. Contractor to take care not to damage and store for reinstall. Remove existing Mechanical diffusers and associated hardware. Remove existing smoke detectors and associated hardware. Remove existing wood molding, take care to preserve for re-use. INSTALL Install new 12" x12" non-hazardous acoustical ceiling tile. Pattern to match existing tile. Install per manufacturers recommendations. Re install light fixtures and restore to original working order. Test to ensure reinstalled fixture operations are restored. Re install mechanical diffusers and restore to original working order. Test to ensure re-installed diffusers functions are restored. Re install and exiting smoke detectors and restore to original working order. Test to ensure operation to re-installed smoke detectors are restored. Patch and repair walls damaged by the removal of the ceiling tiles. Patch and repair wall as required and re install molding. Paint walls as required after ceiling tile and other item are installed (all items to match existing). Contractor shall replace any items damaged during construction.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents