Similar Projects
WCR23/Great Western Trail Pedestrian Connection - Design and Consultation Service
Post-Bid
Severance, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

23rd Avenue Road Construction
Results
Evans, CO 80620

East Harmony Road and 1st Street Corridor Plans
Results
Severance, CO 80546

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

On Call Concrete Services
Infrastructure, Alteration
Post-Bid
Greeley, CO

2020 Bike Walk Maintenance Program
Results
Greeley, CO 80631

I-76 MP 50-74, EB LN 2 (Driving Lane)
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

35th Avenue and O Street Roundabout Project
Infrastructure
Post-Bid
Greeley, CO 80631

Hidden Valley Parkway Extension
Results
$1,000,000 to $1,500,000 est. value
Severance, CO 80546

Idaho Street and RailRoad Pond Improvements
Infrastructure
Post-Bid
Evans, CO 80620

Clerk and Recorder Building Site Work
Results
Greeley, CO 80631

Greeley Evans Transit Yard Concrete Repair
Results
Greeley, CO 80631

Colorado Boulevard & State Highway 392 Intersection & Trail Improvements
Results
Windsor, CO

Reported 01/12/2022 12:00 AM
Project Title

Collins (WCR 74)-35 Roundabout

Physical Address View project details and contacts
City, State (County) Eaton, CO 80615   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the roundabout improvements with installation of approximately 3,552 TON of HMA, 2,911 CY of ABC, 4,389 SY of 8.5" Concrete Pavement-Truck Apron, 1,630 SY of Concrete Pavement-Median (6"), 820 LF of 15" RCP, 152 LF of 18" RCP, 82 LF of 24" RCP, 111 LF of 36" RCP, 87 LF of RCES (23"x14"), 1,055 SY Concrete Pavement Sidewalk, 4,422 LF of CDOT Vertical II-B (2' Gutter), 3,527 LF. of CDOT Mountable Type-I-M (1' Gutter), 263 LF CDOT Mountable Type II-M (2' Gutter), 18,284 SY Base/Subbase Prep other miscellaneous work. Work also includes removal and disposal off-site of approximately 28100 SF of Gravel Surface, 11,242 SY of Asphalt Pavement, 260 LF of Curb and Gutter, 264 LF. Storm Culvert and other miscellaneous work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents