Similar Projects
Northern Boulevard Expansion Phase II
Bidding
Rio Rancho, NM

Construction services for White Sands Village
Bidding
Pojoaque, NM

Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Valle de Oro Outlet Structure
Post-Bid
$2,600,000 est. value
Albuquerque, NM 87107

SWNARRC - Demo and Construct Pond Kettles
Demolition
Results
$1,000,000 to $250,000 est. value
Dexter, NM 88230

Z--Installation of Continuous Channel Drain for Water
Results
$25,000 to $100,000 est. value
Kirtland, NM

Fairgrounds Drainage and ADA Compliance Plan
Post-Bid
Portales, NM

Calle Baack Roadway and Drainage Improvements
Results
Bernalillo, NM 87004

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

City Wide Pond Maintenance
Results
Albuquerque, NM

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

Arroyo Flood Control Authority (Sscafca) Lisbon Channel Improvements Project
Results
Less than $400,242 est. value
Rio Rancho, NM 87124

Restore Some Retention Dams and Erosion Control Structures
Post-Bid
Cuba, NM 87013

Wide Flood Control Rehabilitation IX
Results
$1,600,000 est. value
Albuquerque, NM

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2020
Post-Bid
Espanola, NM 87532

Last Updated 02/03/2020 04:19 PM
Project Title

Vado West Floodplain Repair

Physical Address View project details and contacts
City, State (County) NM   (Dona Ana County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repairing an approximately one half (0.5) mile segment of floodplain (Vado West Floodplain) to prevent erosion of the floodplain and levee system. This floodplain area will also serve as a rehabilitation project to provide riparian habitat as part of the environmental mitigation associated with the work done on the east levee directly across the Rio Grande. The current floodplain has eroded and fill will be required to re-establish normal boundaries to protect the existing levee system. This fill may come from existing islands inside the main river channel. These islands may also provide willows and other plants necessary to establish a riparian belt on the proposed floodplain site. The major construction efforts include, but are not limited to, installing gabions and reno mattresses, backfilling eroded and excavated areas, transplanting coyote willows, planting longstem shrubs, pole planting trees, seeding to revegetate site, and maintenance of all vegetation for at least one (1) year.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents